Skip to main content

Colombia’s latest bridge project

The new contract for Colombia’s Chirajara Bridge project has now been awarded to a consortium, Eiffage-Puentes y Torones. The consortium will handle the design and construction work for the new bridge. The structure will be a replacement for the earlier bridge, which collapsed as its construction was being finalised in January 2018, just a few months before it had been scheduled to open for traffic in March 2018. The collapse of the earlier structure resulted in 10 fatalities as well as causing serious inju
October 12, 2018 Read time: 2 mins

The new contract for Colombia’s Chirajara Bridge project has now been awarded to a consortium, Eiffage-Puentes y Torones. The consortium will handle the design and construction work for the new bridge. The structure will be a replacement for the earlier bridge, which collapsed as its construction was being finalised in January 2018, just a few months before it had been scheduled to open for traffic in March 2018. The collapse of the earlier structure resulted in 10 fatalities as well as causing serious injuries to other construction personnel and the incident caused considerable controversy in Colombia.

This new design will again be a cable-stayed structure, measuring 446m long and will be up to 150m high over the gorge. Work to build the new bridge is due to commence in the first quarter of 2019 and should take 22 months to complete. The bridge construction site is located in the Cundinamarca Department and forms part of an upgrade for Colombia’s National Route 40, between the capital Bogota and Villavicencio.

Related Content

  • Berlin bridge replacement project planned
    November 11, 2020
    An important Berlin bridge replacement project is being planned.
  • Wacker Neuson bullish with strong results
    May 8, 2019
    The Wacker Neuson Group reports a strong financial performance for the first quarter of 2019. The firm’s results reveal a double-digit rise in revenue to €434.6 million, a gain of 17%. The company saw even higher growth of profit before interest and tax (EBIT) growth to reach €30.2 million, a jump of 31%. Meanwhile the firm’s EBIT margin improved to 6.9%, a gain of 0.7%. “This strong start to the year sees us continue the dynamic pace of growth from the fourth quarter of 2018. Demand for our products and
  • Emovis continues with Mersey Gateway tolling
    March 18, 2022
    Emovis provides collection of tolls and charges for both Mersey Gateway Crossing and the older 87m-long Silver Jubilee Bridge through its merseyflow brand name.
  • India pushing ahead with infrastructure projects
    July 4, 2012
    Despite the economic downturn, India looks to be pressing ahead with its major infrastructure projects to further boost its incredible growth. Patrick Smith reports India, which like most countries has been affected by the current economic climate, although not to the same extent, is pressing ahead with its ambitious highway construction plans. Each week new projects are completed, started or awarded as the nation seeks to improve its transportation requirements. These are needed to meet the aspirations of