Skip to main content

Colombia’s latest bridge project

The new contract for Colombia’s Chirajara Bridge project has now been awarded to a consortium, Eiffage-Puentes y Torones. The consortium will handle the design and construction work for the new bridge. The structure will be a replacement for the earlier bridge, which collapsed as its construction was being finalised in January 2018, just a few months before it had been scheduled to open for traffic in March 2018. The collapse of the earlier structure resulted in 10 fatalities as well as causing serious inju
October 12, 2018 Read time: 2 mins

The new contract for Colombia’s Chirajara Bridge project has now been awarded to a consortium, Eiffage-Puentes y Torones. The consortium will handle the design and construction work for the new bridge. The structure will be a replacement for the earlier bridge, which collapsed as its construction was being finalised in January 2018, just a few months before it had been scheduled to open for traffic in March 2018. The collapse of the earlier structure resulted in 10 fatalities as well as causing serious injuries to other construction personnel and the incident caused considerable controversy in Colombia.

This new design will again be a cable-stayed structure, measuring 446m long and will be up to 150m high over the gorge. Work to build the new bridge is due to commence in the first quarter of 2019 and should take 22 months to complete. The bridge construction site is located in the Cundinamarca Department and forms part of an upgrade for Colombia’s National Route 40, between the capital Bogota and Villavicencio.

Related Content

  • Forming iconic structures
    July 18, 2012
    Specially designed and constructed formwork is being used to create some iconic bridges worldwide The Golden Ears Bridge over the Fraser River will unite the municipalities of Richmond, New Westminister and Delta in the scenic British Columbia province of Canada. The bridge, part of a CAD$800 million (US$670 million) project, is an 'extra dosed' cable stayed bridge, which means the deck will be supported by both cables and the structure itself. This design reduces the overall height of the two towers as req
  • Chilean bridge project achieves resolution
    February 26, 2020
    A resolution has been achieved for Chile’s Chiloe Island bridge project.
  • Copy of New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    May 14, 2018
    The Canadian city’s replacement Champlain Bridge will open on schedule at the end of the year. Montreal, one of Canada’s largest cities, will have a well-earned Christmas present in December when the new Champlain Bridge opens after 42 months of construction. The new bridge, part of a six-lane 6km corridor including roads, is being built alongside the original bridge over the Saint Lawrence River and Seaway canal system. The new bridge, 3.4km long, runs from the île des Soeurs to Brossard, immediately dow