Skip to main content

Colombia’s high bridge construction completion

Completion of construction work on Colombia Hisgaura Bridge will be achieved in July 2018. The new bridge will be the highest of the cable-stayed type in Latin America and forms part of the road connecting Malaga with Los Curos. The bridge measures 148.3m high by 653m long and work on its deck has been completed. The bridge has cost US$35.3 million to build, with the work being carried out by contractor Sacyr. The new bridge is located close to San Andres and the project has included a number of challenges
June 8, 2018 Read time: 1 min
Completion of construction work on Colombia Hisgaura Bridge will be achieved in July 2018. The new bridge will be the highest of the cable-stayed type in Latin America and forms part of the road connecting Malaga with Los Curos. The bridge measures 148.3m high by 653m long and work on its deck has been completed. The bridge has cost US$35.3 million to build, with the work being carried out by contractor Sacyr. The new bridge is located close to San Andres and the project has included a number of challenges, not the least of which is the mountainous terrain in the area through which the road passes.

Related Content

  • Mersey Gateway Bridge has won IABSE’s Outstanding Structure Award
    June 25, 2019
    The UK’s Mersey Gateway Bridge has picked up the Outstanding Structure Award 2019 from IABSE, the International Association for Bridge and Structural Engineering*. Judges described the bridge, designed by Cowi, as "an elegantly integrated solution for a multi-span concrete cable stay bridge in which form follows function". "Everyone involved with the design and construction the Mersey Gateway Bridge over the past six years knows that this is an incredibly special structure,” said Paul Sanders, Cowi’s
  • Mersey Gateway Bridge has won IABSE’s Outstanding Structure Award
    September 19, 2019
    The UK’s Mersey Gateway Bridge has picked up the Outstanding Structure Award 2019 from IABSE, the International Association for Bridge and Structural Engineering* Judges described the bridge, designed by Cowi, as "an elegantly integrated solution for a multi-span concrete cable stay bridge in which form follows function". "Everyone involved with the design and construction the Mersey Gateway Bridge over the past six years knows that this is an incredibly special structure,” said Paul Sanders, Cowi’s p
  • Final beam for Gerald Desmond Bridge replacement
    May 1, 2020
    The US$1.47 billion project was started in 2013 and open later this year.
  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.