Skip to main content

Colombia’s ANI launches US$742.09mn Mulalo-Loboguerrero road tender

Colombia's National Infrastructure Agency (ANI) has launched a near US$742.1 million (COP 1.4 trillion) tender for a double-lane road between Mulalo and Loboguerrero. All interested parties have ten working days to object the terms and conditions set for this tender. The project involves a road of 31.8km, including 11km of tunnels and more than 2km of bridges. Ten consortia have been pre-qualified for this project already.
October 31, 2013 Read time: 1 min
Colombia's National Infrastructure Agency (ANI) has launched a near US$742.1 million (COP 1.4 trillion) tender for a double-lane road between Mulalo and Loboguerrero. All interested parties have ten working days to object the terms and conditions set for this tender. The project involves a road of 31.8km, including 11km of tunnels and more than 2km of bridges. Ten consortia have been pre-qualified for this project already.

Related Content

  • Spanish firms pre-qualify for US$1.15bn worth of Colombian road projects
    August 7, 2013
    Several Spanish firms with operations in Colombia have gained pre-qualification for two tenders to build and maintain two roads in the country requiring an estimated combined investment of US$1.15 billion. OHL Concesiones Chile and OHL Concesiones Colombia (part of the Spanish OHL group), Sacyr Concesiones Colombia (part of Spanish group Sacyr) and Ortiz Construcciones y Proyectos Colombia, and Acciona Concesiones Chile (part of the Spanish group Acciona), are pre-qualified for the Pacific 2 Connection. The
  • Colombia’s delayed La Linea Tunnel and tertiary road development programme seeing progress
    July 6, 2017
    Progress is now being seen in Colombia with regard to key tunnel and road projects. A consortium comprising Conconcreto and CSS Constructores is to complete the 12% of work still needed to finish the La Linea Tunnel project.
  • Colombia’s key 4G road projects underway
    January 5, 2018
    Colombia is moving ahead with its 4G programme, as nine of the 30 key projects in the road development scheme now financially secured. The remaining 21 projects are now being built, while 25 of the projects from the 1G, 2G and 3G schemes are already in use, having expanded Colombia’s network by a total of 3,743km. Colombia's National Infrastructure Agency (ANI) says that 10 projects are being carried out entirely with private funding. In addition, over the last seven years, 48km of tunnels and 430 bridges
  • Colombia’s La Linea Tunnel will be completed
    September 16, 2015
    Colombia's national road institute (Invias) has said that the La Linea tunnel project will open to traffic in 2017. The project has been delayed on several occasions and due to a variety of reasons, presenting a luckless and lengthy tale of woe for Colombia’s transport ministry. Early in its lifetime the project was held back by unexpected geological issues arising from more challenging ground conditions than had been initially realised. The project was also delayed by insurance problems for some of the fir