Skip to main content

Colombia’s ANI launches US$742.09mn Mulalo-Loboguerrero road tender

Colombia's National Infrastructure Agency (ANI) has launched a near US$742.1 million (COP 1.4 trillion) tender for a double-lane road between Mulalo and Loboguerrero. All interested parties have ten working days to object the terms and conditions set for this tender. The project involves a road of 31.8km, including 11km of tunnels and more than 2km of bridges. Ten consortia have been pre-qualified for this project already.
October 31, 2013 Read time: 1 min
Colombia's National Infrastructure Agency (ANI) has launched a near US$742.1 million (COP 1.4 trillion) tender for a double-lane road between Mulalo and Loboguerrero. All interested parties have ten working days to object the terms and conditions set for this tender. The project involves a road of 31.8km, including 11km of tunnels and more than 2km of bridges. Ten consortia have been pre-qualified for this project already.

Related Content

  • Crossing the Alps for five decades
    March 24, 2020
    Italy’s A22 Autostrada route is a key transport connection for Europe and also a model for efficient operational management
  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.
  • Fatalities increased on US roads during 2012
    July 5, 2013
    Cause for concern comes from the US where the National Highway Transportation Safety Agency (NHTSA) has revealed an increase in road fatalities during 2012. The NHTSA’s statistical projection of traffic fatalities suggests that 34,080 people died in vehicle traffic crashes in 2012, an increase of about 5.3% over the 32,367 killed in 2011.
  • Construction is commencing on Covimar’s key Colombian contract
    January 29, 2019
    Construction is commencing on a key contract for Colombian road firm Nueva Via al Mar (Covimar). The firm will handle the 32km Mulalo-Loboguerrero fourth generation (4G) road project. The new route will improve transport of heavy goods between Buenaventura and Cali. Covimar has the concession for the link until 2040. The project is costing US$527.6 million but faces a number of environmental challenges as it passes through a protected area as well as over a number of waterways.