Skip to main content

Colombian tunnel project progress

A key Colombian tunnel project is seeing progress.
By MJ Woof August 31, 2020 Read time: 1 min
Progress is being seen in Colombia for the Tunel de Occidente project - image © courtesy of Wollertz, Dreamstime.com

An important road tunnel project in Colombia is seeing progress being achieved. Driving work for the second tube of the Tunel de Occidente project has been completed, some two months ahead of schedule.

Around 497,400m3 of material has been removed from the tunnel drives since excavation commenced in September 2018. The Tunel de Occidente features twin parallel tubes, each with a length of 4.6km. The tunnel forms part of the Autopista al Mar 1 road project, linking Medellin with Santa Fe.

The tunnel is being built by the concessionaire Desarrollo Vial al Mar (Devimar).

Related Content

  • Mott MacDonald to upgrade major west Spain highway
    July 17, 2013
    Mott MacDonald (MM) has been appointed by Sociedad Concesionaria Autovía de la Plata as lender’s technical advisor for a major highway upgrade in western Spain. The project involves the design, construction, maintenance, operation and finance of a 49km two-lane dual carriageway between Benavente and Zamora. The new road, which will bypass the existing single carriageway through local villages, will form the last section of the 809km A-66 Autovía de la Plata highway, connecting Gijon in the north to Seville
  • Pennsylvania Turnpike celebrating 80th anniversary
    March 20, 2020
    The Pennsylvania Turnpike will celebrate its 80th anniversary during 2020.
  • Colombia key city highway connection
    September 2, 2016
    An upgrade of the route connecting Colombia’s capital Bogota with the second city of Medellin is now being considered. The plan would see the route being upgraded to a highway along a 120km stretch of the route, which would feature two lanes of traffic in either direction.
  • Kuwait’s Sheikh Jaber al-Ahmad Al-Sabah Causeway opens
    August 27, 2019
    World Highways revisits the world’s fourth longest sea bridge - four years to construct and which has slashed travel time between Kuwait’s largest island and the capital city