Skip to main content

Colombian tunnel project faces further delays

The Colombian Government is looking to cancel the contract for the construction of the La Linea tunnel. This project has already been beset by an array of problems since it was first conceived and now looks set to be further delayed. Work was supposed to have been 20% complete by March 2014, however a series of delays had put the project far behind schedule and by March 2014, only 12% of the work had been carried out. In June 2014, the project was supposed to be 50% complete, but work was in fact just 14% h
September 16, 2014 Read time: 2 mins
The Colombian Government is looking to cancel the contract for the construction of the La Linea tunnel. This project has already been beset by an array of problems since it was first conceived and now looks set to be further delayed. Work was supposed to have been 20% complete by March 2014, however a series of delays had put the project far behind schedule and by March 2014, only 12% of the work had been carried out. In June 2014, the project was supposed to be 50% complete, but work was in fact just 14% had been carried out. A report by Consorcio DIS-EDL highlighted that the key objectives and deadlines for the project would not be met. The project is regarded as a priority in terms of national road infrastructure and the Colombian Government has paid 98% of the value of the contract already. The contract was due to expire in November 2014.

Related Content

  • UK road investment strategy questioned
    July 31, 2023
    A report from the House of Commons Transport Committee recommended cancellation of some major new projects such as the Stonehenge Tunnel and the Lower Thames Crossing.
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • UK developing plan to tackle driving under the influence of drugs
    March 22, 2012
    The UK Government is now working on a plan to address the road safety issues caused by driving under the influence of drugs. A panel of experts has been set up to evaluate the levels of various illegal drugs in the bloodstream that would affect driving ability.
  • Breakthrough for Bosnia’s Vranduk Tunnel
    March 7, 2022
    The twin-tube Vranduk Tunnel is being built using the new Austrian tunnel method by Azerbaijan's Azvirt and Hering dd Siroki Brijeg contractors.