Skip to main content

Colombian tunnel drive nearing completion

The excavation work for the new La Quiebra road tunnel link in Colombia is close to completion. The drive is being carried out from both ends of the tunnel and should meet by November 2019. The tunnel construction work will then include completing the lining, building the roadway and carrying out fitting out work. The 8.4km tunnel is costing around US$170 million to build and should be complete by December 2020. The tunnel will form part of the Vias del Nus 4G highway connecting the country’s second city, M
October 14, 2019 Read time: 1 min

The excavation work for the new La Quiebra road tunnel link in Colombia is close to completion. The drive is being carried out from both ends of the tunnel and should meet by November 2019. The tunnel construction work will then include completing the lining, building the roadway and carrying out fitting out work. The 8.4km tunnel is costing around US$170 million to build and should be complete by December 2020. The tunnel will form part of the Vias del Nus 4G highway connecting the country’s second city, Medellin, with Colombia’s Caribbean coast.

Related Content

  • Mexico bridge project requiring funding
    November 18, 2019
    A new bridge project for Mexico’s Cancun tourist resort is expected cost US$239 million.
  • Colombia highway construction projects planned
    September 28, 2017
    A series of highway and tunnel projects are planned for Colombia’s Antioquia Department. These new tunnel and highway projects form part of Colombia’s 4G infrastructure development programme. In all 19 tunnel stretches are planned for the eight highways being built in Antioquia as part of the 4G programme. The new highways are providing 28,000 jobs in all and will improve transport connections between Antioquia Department and Colombia’s Atlantic and Pacific coasts.
  • Spanish firms pre-qualify for US$1.15bn worth of Colombian road projects
    August 7, 2013
    Several Spanish firms with operations in Colombia have gained pre-qualification for two tenders to build and maintain two roads in the country requiring an estimated combined investment of US$1.15 billion. OHL Concesiones Chile and OHL Concesiones Colombia (part of the Spanish OHL group), Sacyr Concesiones Colombia (part of Spanish group Sacyr) and Ortiz Construcciones y Proyectos Colombia, and Acciona Concesiones Chile (part of the Spanish group Acciona), are pre-qualified for the Pacific 2 Connection. The
  • Mont Blanc Tunnel maintenance closure
    April 26, 2024
    The Mont Blanc Tunnel will be closed for maintenance.