Skip to main content

Colombian bridge now complete

A key Colombian bridge replacement is now complete.
By MJ Woof September 29, 2020 Read time: 1 min
A key bridge link is now complete in Colombia - image © courtesy of Wollertz, Dreamstime.com
A key bridge replacement project in Colombia is now complete. The Charte Bridge takes the place of an earlier link, which failed in 2016. The new 162m bridge cost US13.2 million to build. Although small, the bridge is an important link in the road connecting Villavicencio and Yopal.

The road improvement project between Villavicencio and Yopal forms part of Colombia’s 4G transport programme. In all, the project is for an improved route measuring 195km, with the work due to be complete by 2023. Some 48km of the route will be entirely new, while 142km of the existing route will benefit from upgrades and improvements. The work is being carried out by a consortium, Concesionaria Vial del Oriente (Covioriente).

Related Content

  • Colombia’s massive roads programme is seeing delays
    March 19, 2024
    Colombia’s massive road expansion programme is seeing delays.
  • Colombia highway construction projects planned
    September 28, 2017
    A series of highway and tunnel projects are planned for Colombia’s Antioquia Department. These new tunnel and highway projects form part of Colombia’s 4G infrastructure development programme. In all 19 tunnel stretches are planned for the eight highways being built in Antioquia as part of the 4G programme. The new highways are providing 28,000 jobs in all and will improve transport connections between Antioquia Department and Colombia’s Atlantic and Pacific coasts.
  • Colombian highway projects being agreed
    March 22, 2017
    Interest is proving strong in Colombia’s Pamplona-Cucuta 4G motorway project, which is currently undergoing the tender process. The country’s National Infrastructure Agency (ANI) has had three bids so far for the project. The 62km stretch of road will be built in Colombia’s Norte de Santander department. The project is expected to cost in excess of US$515 million. So far ANI’s bids have come from CCA Civil Colombia, the Colombia-based subsidiary of Spanish contractor Sacyr, as well as the consortium Estruct
  • $270 million Tanzania bridge opens
    July 2, 2025
    A $270 million bridge has opened in Tanzania.