Skip to main content

Colombia tunnel construction contract commencing

Driving work has commenced for Colombia’s Toro Tunnel project. The tunnel will measure 9.8km long and is located in Colombia’s Antioquia Department, with the completion expected in 2022. The project is costing US$650.5 million and the link is intended to provide a link between the Autopista al Mar 1 and Autopista al Mar 2 highways. When complete the tunnel will also cut the travel time between Medellin and Uraba to four hours.
February 5, 2018 Read time: 2 mins
Driving work has commenced for Colombia’s Toyo Tunnel project. The tunnel will measure 9.8km long and is located in Colombia’s Antioquia Department, with the completion expected in 2022. The project is costing US$650.5 million and the link is intended to provide a link between the Autopista al Mar 1 and Autopista al Mar 2 highways. When complete the tunnel will also cut the travel time between Medellin and Uraba to four hours.


The tunnel forms part of a wider project to improve infrastructure links in Antioquia Department, with work to 18 tunnels and 30 bridges planned to be complete by 2028. Construction for a stretch of road from Santa Fe to the start of the Toyo Tunnel is expected to start in 2019. The tender for this stretch will be held shortly and will be managed by Colombia's National Road Institute (2812 Invias). The infrastructure programme also includes carrying out road works from Giraldo to Canasgordas, with this due for completion in 2023.

Construction of the La Quiebra tunnel, also in Antioquia department, is now underway. This work is costing $223.5 million and the tunnel forms part of the Vias del Nus road project. The tunnel will measure 4.1km long and will cut journey times from Porcesito to Cisneros by 30 minutes when it is complete. The road project includes a 24.3km-long dual-carriageway between Pradera and Porcesito and the addition of a third lane along 2.7km at San Jose del Nus-Alto de Dolores road. It also includes rebuilding a 35.6km section from Cisneros to Alto de Dolores. Once the project is complete it will boost travel connections from Medellin to Valle de Aburra, reducing the journey time from 3.5 hours to 2 hours.

For more information on companies in this article

Related Content

  • £185 million deal for A9 in Scotland
    August 9, 2024
    A £185 million deal has been awarded for the A9 in Scotland.
  • Elevated highway in Vietnam starting construction
    December 12, 2016
    Construction work on a new elevated highway route through Vietnamese conurbation Ho Chi Minh City is commencing. The project involves building a 30.4km stretch of highway, Elevated Road No5, through the busy metropolis and is expected to cost US$785.25 million. The new four lane road will run above National Highway 1A, with the work forming part of a wider project intended to help reduce Ho Chi Minh City’s chronic congestion problems. In all the city’s road transport department plans to construct five of th
  • Colombian costs climb
    March 1, 2012
    Major cost increases are expected for the 1,250km Autopistas de la Montana highways project in Colombia.
  • Colombian costs climb
    May 3, 2012
    Major cost increases are expected for the 1,250km Autopistas de la Montana highways project in Colombia. According to local company ISA, the cost of the project will exceed the projected US$3.5 billion. However the new links are expected to offer better transport connections and boost travel speeds.