Skip to main content

Colombia tunnel construction contract commencing

Driving work has commenced for Colombia’s Toro Tunnel project. The tunnel will measure 9.8km long and is located in Colombia’s Antioquia Department, with the completion expected in 2022. The project is costing US$650.5 million and the link is intended to provide a link between the Autopista al Mar 1 and Autopista al Mar 2 highways. When complete the tunnel will also cut the travel time between Medellin and Uraba to four hours.
February 5, 2018 Read time: 2 mins
Driving work has commenced for Colombia’s Toyo Tunnel project. The tunnel will measure 9.8km long and is located in Colombia’s Antioquia Department, with the completion expected in 2022. The project is costing US$650.5 million and the link is intended to provide a link between the Autopista al Mar 1 and Autopista al Mar 2 highways. When complete the tunnel will also cut the travel time between Medellin and Uraba to four hours.


The tunnel forms part of a wider project to improve infrastructure links in Antioquia Department, with work to 18 tunnels and 30 bridges planned to be complete by 2028. Construction for a stretch of road from Santa Fe to the start of the Toyo Tunnel is expected to start in 2019. The tender for this stretch will be held shortly and will be managed by Colombia's National Road Institute (2812 Invias). The infrastructure programme also includes carrying out road works from Giraldo to Canasgordas, with this due for completion in 2023.

Construction of the La Quiebra tunnel, also in Antioquia department, is now underway. This work is costing $223.5 million and the tunnel forms part of the Vias del Nus road project. The tunnel will measure 4.1km long and will cut journey times from Porcesito to Cisneros by 30 minutes when it is complete. The road project includes a 24.3km-long dual-carriageway between Pradera and Porcesito and the addition of a third lane along 2.7km at San Jose del Nus-Alto de Dolores road. It also includes rebuilding a 35.6km section from Cisneros to Alto de Dolores. Once the project is complete it will boost travel connections from Medellin to Valle de Aburra, reducing the journey time from 3.5 hours to 2 hours.

For more information on companies in this article

Related Content

  • Colombian road improvement works
    October 20, 2022
    Colombian road improvement works are being carried out.
  • Colombia road upgrades being planned
    January 25, 2019
    Major upgrades are being planned to Colombia’s road network. A report produced by Colombia's national road institute (Invias) has revealed that just 13.6% of the country’s 7,019km key road network is in very good condition. Of concern is that 17.7% of Colombia’s key road network is in poor condition, with 0.86% in very poor state. Around 33.6% is in good condition and 34.3% is in average condition. The report reveals that Colombia’s Cordoba Department has the worst roads, followed by Ocana Department. Me
  • Inter-oceanic Corridor for Brazil-Bolivia-Chile
    March 2, 2015
    A new Bolivian link is playing a key role in a major Latin American highway – Mauro Nogarin reports. Construction of a new route through Bolivia will help deliver improved transport between Latin America’s Pacific and Atlantic coasts. The construction of the highway between Santa Barbara-Caranavi-Quiquibey has been carried out by the consortium ARBOL. This firm is a partnership between the Argentinean company Grupo Eling and Administradora de Caminos Boliviana (ABC). The stretch of highway is an important s
  • Colombian road project
    April 23, 2012
    Road management firm Ruta del Sol intends to invest US$846 million in Colombia’s Ruta del Sol highway during 2012. The highway connects Colombia’s Central region with the Atlantic coast. Ruta de Sol has already invested $282 million in maintenance works for the 600km or so of existing highway and intends to extend the highway by a further 100km. Ruta de Sol has already opened the first 10km of the highway that forms part of the Sector 2 stretch of the, linking Puerto Salgar (Cundinamarca) to San Roque (Cesa