Skip to main content

Colombia tunnel construction contract commencing

Driving work has commenced for Colombia’s Toro Tunnel project. The tunnel will measure 9.8km long and is located in Colombia’s Antioquia Department, with the completion expected in 2022. The project is costing US$650.5 million and the link is intended to provide a link between the Autopista al Mar 1 and Autopista al Mar 2 highways. When complete the tunnel will also cut the travel time between Medellin and Uraba to four hours.
February 5, 2018 Read time: 2 mins
Driving work has commenced for Colombia’s Toyo Tunnel project. The tunnel will measure 9.8km long and is located in Colombia’s Antioquia Department, with the completion expected in 2022. The project is costing US$650.5 million and the link is intended to provide a link between the Autopista al Mar 1 and Autopista al Mar 2 highways. When complete the tunnel will also cut the travel time between Medellin and Uraba to four hours.


The tunnel forms part of a wider project to improve infrastructure links in Antioquia Department, with work to 18 tunnels and 30 bridges planned to be complete by 2028. Construction for a stretch of road from Santa Fe to the start of the Toyo Tunnel is expected to start in 2019. The tender for this stretch will be held shortly and will be managed by Colombia's National Road Institute (2812 Invias). The infrastructure programme also includes carrying out road works from Giraldo to Canasgordas, with this due for completion in 2023.

Construction of the La Quiebra tunnel, also in Antioquia department, is now underway. This work is costing $223.5 million and the tunnel forms part of the Vias del Nus road project. The tunnel will measure 4.1km long and will cut journey times from Porcesito to Cisneros by 30 minutes when it is complete. The road project includes a 24.3km-long dual-carriageway between Pradera and Porcesito and the addition of a third lane along 2.7km at San Jose del Nus-Alto de Dolores road. It also includes rebuilding a 35.6km section from Cisneros to Alto de Dolores. Once the project is complete it will boost travel connections from Medellin to Valle de Aburra, reducing the journey time from 3.5 hours to 2 hours.

For more information on companies in this article

Related Content

  • Chile road project, tender process opening
    April 17, 2019
    The tender process is opening for an important road project for Chile. The bidding process for the 142km road upgrade project is opening at the end of May 2019, with construction expected to start in 2021 once the necessary permissions process and financing package has been finalised. The work is for the improvement of the Camino de la Fruta road link, Chile’s Ruta 66. This road runs from San Antonio on the coast and connects with the country’s key north-south link, Ruta 5, at Pelequén to the north of San F
  • Colombia’s infrastructure development
    December 5, 2013
    Colombia is benefiting from heavy investment in infrastructure that is helping boost the country’s economy. At the same time, tough policies have also reduced crime considerably and helped stabilise economic development. This process of economic growth and overall stabilisation looks set to continue as the Colombian Government has recently unveiled its plans for highway construction over the next 10 years. This infrastructure programme is also tipped to raise demand for surety products owing to government c
  • Costa Rica concrete repairs
    February 15, 2012
    Work has started on the long awaited San Jose-Caldera Highway in Costa Rica, following numerous delays and setbacks. The new 77.5km highway will be used daily by more than 81,000 vehicles, reducing the travel time between the Central Valley and the Central Pacific Coast by at least 30 minutes.
  • Vietnam’s road programme gearing up
    January 7, 2019
    Vietnam’s impressive road development programme is now gearing up, with a series of major projects scheduled to commence in 2019. Work is starting on three key projects: the My Thuan 2 Bridge; the Cam Lo to La Son highway section; the Cao Bo to Mai Son highway section. All three of these projects will form part of the Eastern North-South Expressway, with the work being overseen by the Ministry of Transport (MOT). The My Thuan 2 Bridge will cost some US$214.3 million and will connect Vinh Long Province with