Skip to main content

Colombia tunnel building work

Excavation work will be complete on a new tunnel stretch in Colombia in Q3 2020.
By MJ Woof May 27, 2020 Read time: 1 min
Work is progressing on Colombia’s Occident Tunnel project - image © courtesy of Wollertz, Dreamstime.com

Driving work will be complete for the second Occident Tunnel section in Colombia during October 2020.

The link forms part of the highway route connecting the city of Medellin with Santa Fe and Uraba. In all, the tunnel will measure 4.6km when it has been bored, with more than 3.6km having already been driven.

The new Autopista al Mar 1 road, including the Occident Tunnel, should be complete by 2022. The project is being managed by Colombia's national infrastructure agency (ANI) and forms part of the country’s road development programme.

Related Content

  • Evonik’s top marks for Colombian tourist highway solution
    May 15, 2014
    Leading German road marking product manufacturer Evonik Industries has played a key role in improving safety on a popular Colombian tourist highway, as Guy Woodford reports Bearing the name of the memorable peacemaker governor of Antioquia, the Guillermo Gaviria Correa road, located between the Colombian municipalities of Medellin and San Jerónimo, connects Medellin to the Uraba Gulf part of the Caribbean Sea. In operation since 2007, the road, in combination with the Fernando Gómez Martínez tunnel –
  • Boom in Asian infrastructure investment
    April 5, 2012
    Investment in China and India continues unabated, but other nations on the continent are eager to attract companies as Patrick Smith reports Asia is still booming despite the current economic crisis, and new infrastructure programmes are constantly coming on stream. Powerhouses China and India, with their double-digit growth figures and huge infrastructure plans (in scope and cost), are leading the way and are still magnets for businesses wishing to expand, both in terms of facilities and customers. But oth
  • Russian road-building industry on verge of massive cuts
    June 10, 2015
    Russia’s road building programme looks set to be cut due to economic issues - Eugene Gerden writes The Russian Government is considering a significant cut to the existing road building programme for the current year. This is due to a current economic crisis in the country, caused by Western sanctions as well as a collapse in the price of oil and gas.
  • Speed and precision make for perfect tunnelling combination
    May 21, 2014
    Speed and precision have been the hallmarks of a number of major road tunnelling projects across the globe over the last 12 months, as the latest sector equipment from leading manufacturers has found itself in high demand. Guy Woodford reports Herrenknecht tunnel boring machines (TBM) have been busy tunnelling under major Chinese rivers, demonstrating phenomenal speed, top safety levels and extreme precision while playing a key role in the construction of road tunnels in the Yangtze River Delta. The Yang