Skip to main content

Colombia road project tender process

The tender process for Colombia’s Buga-Buenaventura fourth generation (4G) toll road project is being planned. The tender for the 114.1km dual carriageway is being handled in two separate stretches however. One of the road stretches will be for a 55.4km section from Buga to Loboguerrero, which is expected to cost US$359.45 million. The 58.7km stretch from Loboguerrero to Buenaventura meanwhile is expected to cost $362.75 million. The Loboguerrero to Buenaventura section of the route includes building a 19km
July 22, 2019 Read time: 1 min

The tender process for Colombia’s Buga-Buenaventura fourth generation (4G) toll road project is being planned. The tender for the 114.1km dual carriageway is being handled in two separate stretches however. One of the road stretches will be for a 55.4km section from Buga to Loboguerrero, which is expected to cost US$359.45 million. The 58.7km stretch from Loboguerrero to Buenaventura meanwhile is expected to cost $362.75 million. The Loboguerrero to Buenaventura section of the route includes building a 19km stretch of dual carriageway, as well as a tunnel measuring 1.4km. The tender process is expected to commence in either the second or third quarter of 2020 and the project will be handled under the PPP model. The project was previously to be constructed the Via Pacifica concession firm but delays resulted in this deal having to be cancelled.

Related Content

  • Moscow-Nizhny Novgorod-Kazan highway project
    March 5, 2019
    Planning is underway for the highway connecting Moscow with Kazan, via Nizhny Novgorod. The tendering process will commence in 2020, with construction then expected to commence in either late 2020 or early 2021. A budget for the project has been set by Russia’s state-owned road company, Avtodor. The initial plans called for the highway covering the 742km between Moscow and Kazan to be complete by 2024. However, it now seems likely that the route, which passes Vladimir, Dzherzhinsk, Niznhy Novgorod and Chebo
  • Bulgaria lets contract for Struma Motorway’s Zheleznitsa Tunnel
    February 15, 2019
    A consortium including local firms GP Group, Global Construction and Via Plan will build the 2km Zheleznitsa Tunnel, part of the Struma Motorway. The contract is worth around €97.5 million and the tunnel will be the longest in Bulgaria. The EU Cohesion Fund will co-finance the project, along with the Bulgarian government under the Operational Programme Transport and Transport Infrastructure 2014-2020. Completion is set for the end of 2023. Two previous tender processes to award the construction con
  • Colombia’s ANI launches US$742.09mn Mulalo-Loboguerrero road tender
    October 31, 2013
    Colombia's National Infrastructure Agency (ANI) has launched a near US$742.1 million (COP 1.4 trillion) tender for a double-lane road between Mulalo and Loboguerrero. All interested parties have ten working days to object the terms and conditions set for this tender. The project involves a road of 31.8km, including 11km of tunnels and more than 2km of bridges. Ten consortia have been pre-qualified for this project already.
  • Work starting on new road tunnel in Nepal
    December 11, 2013
    Work is starting on a new road tunnel in Nepal. The tunnel will form part of a 58km highway route that will improve connectivity in the country from capital Kathmandu to Kulekhani and Hetauda. The Kathmandu - Kulekhani - Hetauda Tunnel (KKHT) HighwayTunnel (KKHT) Highway is a major project for Nepal and is being carried out under the PPP model. The 4.5km tunnel will feature four traffic lanes, and is being developed by the Nepal Purwardhar Bikash Company. In all, the 58km route will feature three tunnel sec