Skip to main content

Colombia road project delayed

Delays are afflicting work on the Zaragoza-Caucasia road upgrade project in Colombia. The work was originally due for completion in December 2018 but is now being finished in the second quarter of 2019. Vandalism to 21 construction machines on the project are the prime cause for the delay. New security measures have been put in place to prevent a recurrence. The project involves resurfacing the road stretch as well as building two new intersections and a bypass loop. The work forms part of the US$139 millio
January 29, 2019 Read time: 1 min

Delays are afflicting work on the Zaragoza-Caucasia road upgrade project in Colombia. The work was originally due for completion in December 2018 but is now being finished in the second quarter of 2019. Vandalism to 21 construction machines on the project are the prime cause for the delay. New security measures have been put in place to prevent a recurrence. The project involves resurfacing the road stretch as well as building two new intersections and a bypass loop. The work forms part of the US$139 million, 145km Conexion Norte fourth generation (4G) road project.

Related Content

  • German highway stretch reopening to be delayed
    February 19, 2019
    Repairs to the A20 highway route in northern Germany are now likely to take longer than initially expected. The route will now take until 2023 to repair, with the work costing some €100 million to carry out and requiring a temporary bridge to carry traffic past the failed section. The temporary bridge accounts for more than half of the cost of the work. The geological problems with the A20 Autobahn route first became visible in September 2018 when a section near Tribsees started to suffer from subsidence.
  • First section of new Texas route opening
    November 21, 2017
    The first stretch of a highway development project in Texas is now open. New southbound toll lanes have been built for the Texas 288 project, running between downtown Houston and the Brazoria County line. The existing southbound traffic is being shifted to these lanes on a temporary basis between Holly Hall and Loop 610. But drivers are not being tolled at present. The US$815 million work is due for completion in 2019, when the tolling system will come into full use. The project involves widening the route
  • Loan provided for Virginia road project
    November 29, 2023
    A US$141 million loan has been provided for a Virginia road project.
  • Russian roads benefiting from rebuilding programme
    November 30, 2018
    Russia’s Federal Road Agency (Rosavtodor) set out an ambitious plan of road development projects for 2018 and is achieving its target. Compared with 2017, Rosavtodor increased its programme of road development for 2018 by 19.5%. Meanwhile Rosavtodor has planned to repair 8,400km of roads, with 97 of the planned works being completed ahead of schedule. Work to a further four sections of roads are also likely to be completed ahead of schedule in the Leningrad Region, Sverdlovsk Region (Urals), Novosibirsk Reg