Skip to main content

Colombia road project delayed

Delays are afflicting work on the Zaragoza-Caucasia road upgrade project in Colombia. The work was originally due for completion in December 2018 but is now being finished in the second quarter of 2019. Vandalism to 21 construction machines on the project are the prime cause for the delay. New security measures have been put in place to prevent a recurrence. The project involves resurfacing the road stretch as well as building two new intersections and a bypass loop. The work forms part of the US$139 millio
January 29, 2019 Read time: 1 min

Delays are afflicting work on the Zaragoza-Caucasia road upgrade project in Colombia. The work was originally due for completion in December 2018 but is now being finished in the second quarter of 2019. Vandalism to 21 construction machines on the project are the prime cause for the delay. New security measures have been put in place to prevent a recurrence. The project involves resurfacing the road stretch as well as building two new intersections and a bypass loop. The work forms part of the US$139 million, 145km Conexion Norte fourth generation (4G) road project.

Related Content

  • Colombian infrastructure projects boost
    February 22, 2022
    Colombian infrastructure projects will be boosted with new budget.
  • Italy’s Paniga Tunnel project on track
    November 18, 2016
    Construction work is proceeding on track for the Paniga Tunnel project in Italy, with the primary drilling and blasting phase now having been completed. Located in Morbegno in northern Lombardy, the tunnel forms part of a bypass stretch for state road 38. Work on the project started in 2015 and is being carried out by Cossi Costruzioni, a subsidiary of Italian civil engineering company Societa Italiana per Condotte d'Acqua (Condotte). The client for the project is ANAS, the Italian state-controlled road com
  • Work starting on second Chesapeake Tunnel project
    September 20, 2017
    Work is now starting on a major tunnel project in the US state of Virginia. Construction of a second tunnel connection for the Chesapeake Bay is expected to cost US$756million. The original Chesapeake Bay Tunnel and Bridge crossing opened to traffic in April 1964 and measures just over 37km long. Construction of a second parallel bridge was commenced in 1995 and opened to traffic in 1999. However the central tunnel link was not widened at that time and now carries more traffic than it was designed for, whil
  • Moscow’s first toll road is being planned
    May 21, 2013
    In Russia’s capital Moscow the finishing touches are being put to a plan to construct the city’s first tolled link. The northern relief road for Kutuzovsky prospect is expected to cost US$1.91 billion to build and will stretch a distance of 10.3km. The tender process for the concession package is being prepared at present and is expected to open for bids shortly. Once complete the new link will connect Moscow’s business centre with Molodogvardeyskaya junction. Meanwhile in the Russian city of Tula, some 193