Skip to main content

Colombia road project delayed

Delays are afflicting work on the Zaragoza-Caucasia road upgrade project in Colombia. The work was originally due for completion in December 2018 but is now being finished in the second quarter of 2019. Vandalism to 21 construction machines on the project are the prime cause for the delay. New security measures have been put in place to prevent a recurrence. The project involves resurfacing the road stretch as well as building two new intersections and a bypass loop. The work forms part of the US$139 millio
January 29, 2019 Read time: 1 min

Delays are afflicting work on the Zaragoza-Caucasia road upgrade project in Colombia. The work was originally due for completion in December 2018 but is now being finished in the second quarter of 2019. Vandalism to 21 construction machines on the project are the prime cause for the delay. New security measures have been put in place to prevent a recurrence. The project involves resurfacing the road stretch as well as building two new intersections and a bypass loop. The work forms part of the US$139 million, 145km Conexion Norte fourth generation (4G) road project.

Related Content

  • Colombia road and tunnel connection to Medellin Airport
    September 13, 2017
    Work is well underway on a new road and tunnel project, which will provide an improved connection between the Colombian city of Medellin and its airport. The new link will measure 24km long in all and the construction work is expected to cost over US$342 million, with completion due at the end of 2018. The project is known overall as the Oriente Tunnel, with the work being carried out as a concession by Concesion Tunel Aburrá-Oriente. The project comprises four sections in all. These are the 786m Seminario
  • California connection construction contract
    December 1, 2017
    The contract to widen a key section of one of Northern California’s most congested highways has now been awarded. The US$107 million package of works will see the building of a new carpool and express lane along a 14.5km stretch of Interstate 680 in the Bay Area. The lane will be built along the northbound stretch of the highway between the Auto Mall Parkway and Highway 84. The southbound express lane will also be upgraded. Construction on this section is being funded by local sales taxes and the work is
  • Slovakia tunnelling project on track
    May 9, 2016
    Work on a key portion of a major tunnelling project in Slovakia has been completed. Contractor Doprastav has complete boring of the 2km Ovciarsko tunnel, which forms part of the D1 highway route. The Ovciarsko lies close to Zilina and Doprastav commenced the drive for the 2.367km long tunnel in September 2014. This is one of two tunnels along the 11km stretch of the D1 between Hricovske Podhradi and Lietavska Lucka. This is one of the most challenging sections of the D1 to construct as it requires building
  • Colombia’s popular highway tenders
    April 7, 2014
    International interest is strong in tenders opening in Colombia for the construction and management of 1,146km worth of highways. These form part of a package for 10 projects known as Autopistas para la Prosperidad, worth some US$4.75 billion in all. OHL has expressed an interest in the Autopista al Mar 2 and Autopista al Rio Magdalena 1 highway projects, which have been valued at around $1.9 billion.