Skip to main content

Colombia road project delayed

Delays are afflicting work on the Zaragoza-Caucasia road upgrade project in Colombia. The work was originally due for completion in December 2018 but is now being finished in the second quarter of 2019. Vandalism to 21 construction machines on the project are the prime cause for the delay. New security measures have been put in place to prevent a recurrence. The project involves resurfacing the road stretch as well as building two new intersections and a bypass loop. The work forms part of the US$139 millio
January 29, 2019 Read time: 1 min

Delays are afflicting work on the Zaragoza-Caucasia road upgrade project in Colombia. The work was originally due for completion in December 2018 but is now being finished in the second quarter of 2019. Vandalism to 21 construction machines on the project are the prime cause for the delay. New security measures have been put in place to prevent a recurrence. The project involves resurfacing the road stretch as well as building two new intersections and a bypass loop. The work forms part of the US$139 million, 145km Conexion Norte fourth generation (4G) road project.

Related Content

  • The Nepalese Government is investing in roads around capital Kathmandu
    May 16, 2012
    A new road-widening strategy is being put into effect in Nepal’s Kathmandu Valley. The aim of this programme is to reduce traffic jams on busy roads, especially during peak hours. A major problem for Kathmandu is that the current road the infrastructure in the city is not sufficient for the increasing numbers of vehicles. In a bid to tackle the problem, the authorities have initiated a programme of road widening in various areas of Kathmandu Valley. However, obstructions have been encountered due to residen
  • Major Indonesian highway projects moving ahead
    December 13, 2018
    A series of major highway projects are now moving ahead in Indonesia. One of the projects is for part of the Trans-Java Toll Road. Work is now starting to build the route and this new 759km toll road will connect Surabaya and Jakarta. Construction is already underway on building the Bogor-Ciawi-Sukabumi Toll Road or Bocimi linking West Java's Ciawi with Cigombong.
  • D8 highway in Czech Republic delayed
    September 19, 2013
    Completion of the final stretch of the D8 highway in the Czech Republic will be delayed. The 4.7km section of highway in the Czech region of Usti Nad Labem Oldrich Bubenicek will not be built by 2015 as planned originally. A landslide that occurred near Litochovice in June 2013 is the reason for the delay. Additional geotechnical surveys now have to be carried out before work can commence to to repair the damage cause by the landslide. It is possible that the results of the survey work will show that the ro
  • Key Botswana road network gets an upgrade
    June 30, 2014
    Representing an investment of around US$113 million, Botswana’s A1 national road between Tonota and Francistown is undergoing a major upgrade This single-lane section is being progressively transformed into a north- and southbound dual carriageway, crossing four existing river bridges along the way. A strategically important transportation route for both Botswana and the southern African region, the A1 passes through Francistown, the nation’s second largest city, heading northwards to end at the Zimbabwe b