Skip to main content

Colombia road project delayed

Delays are afflicting work on the Zaragoza-Caucasia road upgrade project in Colombia. The work was originally due for completion in December 2018 but is now being finished in the second quarter of 2019. Vandalism to 21 construction machines on the project are the prime cause for the delay. New security measures have been put in place to prevent a recurrence. The project involves resurfacing the road stretch as well as building two new intersections and a bypass loop. The work forms part of the US$139 millio
January 29, 2019 Read time: 1 min

Delays are afflicting work on the Zaragoza-Caucasia road upgrade project in Colombia. The work was originally due for completion in December 2018 but is now being finished in the second quarter of 2019. Vandalism to 21 construction machines on the project are the prime cause for the delay. New security measures have been put in place to prevent a recurrence. The project involves resurfacing the road stretch as well as building two new intersections and a bypass loop. The work forms part of the US$139 million, 145km Conexion Norte fourth generation (4G) road project.

Related Content

  • Washington DC’s historic bridge replacement project
    June 11, 2019
    The project to replace a historic bridge in US capital Washington DC is providing major challenges for its builders - Mike Woof writes
  • Peru capital ring road tangle
    June 27, 2016
    The project to construct a new ring road around Peru’s capital Lima is facing a difficult tangle that has to be unravelled. However the contractor tasked with the construction work, Grupo Ferrovial, is hoping to be able to make up time and start work in January 2017. The tangle needing to be addressed is between Peru’s Ministry of Transport and Communications and the authorities in the city of Lima as the two parties have not agreed the details of the project. The contractor believes it can start work in ti
  • Colombian president pledges over 3,200km of double-lane highways by 2018
    September 27, 2012
    Colombia’s president Juan Manuel Santos has made a pledge to have over 3,200kms of double-lane roads in Colombia by 2018. A total of 1,700km will be built by 2014. Santos has announced 30 infrastructure projects which form part of the fourth round of road concessions. Six tenders involving works worth an estimated US$ 4.44 billion will be launched before the end of this year.
  • Costa Rica road project facing delays?
    May 2, 2019
    A major road project in Costa Rica is now facing delays. The widening project for Route 32 is being carried out by the Chinese contractor China Harbour Engineering Company (CHEC). However the land required for a significant portion of the project has not yet been secured by Costa Rica’s Ministry for Public Works and Transportation (MOPT). It is not now clear whether the road widening work will be completed within the intended schedule. So far just 10% of the work required for the whole project has so fa