Skip to main content

Colombia highway plans announced

Key Colombian highway plans are being announced.
By MJ Woof June 4, 2020 Read time: 2 mins
A series of road works is getting underway in Colombia - image © courtesy of Wollertz, Dreamstime.com

A series of major highway projects are under construction in Colombia as the country develops its road network.

Construction work is being carried out on the road between Villavicencio and Yopal in Casanare Department. Social distancing and other measures have been implemented to ensure the safety of site personnel. The road is 266km in length and work has recommenced on four of the seven sections, with the project expected to cost in excess of US$956 million. The 140m Charte Bridge should be complete by the third quarter of 2020 and is expected to carry 10,000 vehicles/day once it opens to traffic.

Work is now restarting in Valle del Cauca Department on 17 construction projects. Construction is underway on the dual carriageway connecting Cali with Candelaria. This road stretch should be complete in the first quarter of 2021, along with work on the Juanchita Bridge. Strict social distancing and health measures have been put in place to ensure the safety of the construction personnel. Work will recommence on the road connecting Cali with Yumbo in due course and this will be complete in the second half of 2020, a slight delay from the original timeline for the first half of 2020, but unavoidable due to the pandemic.

An agreement over the necessary land required for road building means that eight projects will be able to progress. The road projects now benefiting include the Ruta del Sol II and III, the Transversal de las Americas as well as the road from Bogota to Villavicencio, the road between Antioquia and Bolivar, and the road connecting Bucaramanga with Barrancabermeja and Yondo.

Related Content

  • Work underway on Texas highway upgrades
    August 25, 2020
    Work is well underway on key Texas highway upgrade projects.
  • Thailand-Laos-China connection
    March 21, 2012
    Work is now underway once more on a new bridge link connecting Laos with Thailand. The US$44 million project is being funded equally by the governments of both countries and work is expected to be complete in June 2013.
  • Concrete paving key to Berlin's airport runways
    February 17, 2012
    High production concrete paving is proving a key feature at the new Berlin airport facility currently under construction The new Berlin-Brandenburg International Airport will soon provide improved links by air to the city. Work started in mid 2006 with the redevelopment of the existing Berlin Schönefeld Airport.
  • Costa Rica concrete repairs
    February 15, 2012
    Work has started on the long awaited San Jose-Caldera Highway in Costa Rica, following numerous delays and setbacks. The new 77.5km highway will be used daily by more than 81,000 vehicles, reducing the travel time between the Central Valley and the Central Pacific Coast by at least 30 minutes.