Skip to main content

Colombia highway concession package awarded

A major highway concession package has been awarded to a consortium in Colombia. Concesionaria Vial Andina (Coviandina) has won the tender to manage the 85.6km road connecting capital Bogota with Villavicencio. The package was awarded by the national infrastructure agency (ANI). Under the terms of the deal, the firm will maintain two sections of the existing road and build a new dual carriageway stretch with two lanes in either direction for the third section. The third stretch poses particular challenges t
November 8, 2019 Read time: 1 min

A major highway concession package has been awarded to a consortium in Colombia. Concesionaria Vial Andina (Coviandina) has won the tender to manage the 85.6km road connecting capital Bogota with Villavicencio. The package was awarded by the national infrastructure agency (ANI). Under the terms of the deal, the firm will maintain two sections of the existing road and build a new dual carriageway stretch with two lanes in either direction for the third section. The third stretch poses particular challenges to construction as it features 21 bridges and six tunnels, with the building work having commenced in 2016. The concession package for the route was previously handled by Concesionaria Vial de los Andes.

Related Content

  • Plans in hand for Colombian highway project
    December 5, 2013
    The Colombian authorities have plans in hand for a US$240 million highway upgrade project. In all, 10 groups have been pre-selected for the tender process for the work, according to a report by Business News Americas. The project is for upgrades and improvements to a 173km stretch of the Puerta de Hierro-Cruz del Viso highway. This work includes improvements to access roads in the area, which lies in Colombia’s northern Sucre, Bolívar and Atlántico departments. The country’s infrastructure agency, ANI, has
  • Concession tender for Brazilian bridge
    December 8, 2014
    Brazil’s Transport Ministry is putting the concession contract to maintain the Rio-Niterói bridge in Rio de Janeiro out to tender. The present 20-year maintenance contract for the bridge held by Ponte will run out in May 31st 2015, reports Business News Americas. The new concession deal will involve maintaining the structure as well as building an underpass underneath Renascença square in Niterói. Construction of the 13.3km pre-stressed concrete structure commenced in 1968 and was completed in 1974, at whic
  • Colombia's roads to recovery
    February 8, 2012
    Colombia's Ministry of Transport is suggesting that the Avenida Longitudinal de Occidente (ALO) road project in Bogota should be carried out by Colombian energy company Empresa de Energia de Bogota (EEB).
  • Chile awards CRCC major Talca-Chillán upgrade
    April 14, 2021
    China Railway Construction Corporation will upgrade and operate a section of Route 5.