Skip to main content

Colombia develops tertiary roads plan; cost overruns for La Linea Tunnel

Colombia has a new plan to develop tertiary roads, while cost overruns for the La Linea Tunnel project will be paid for.
By MJ Woof January 28, 2020 Read time: 1 min
Colombia is to improve its tertiary roads to boost connectivity; Image © courtesy of Marcos Souza, Dreamstime

Colombia has set out plans to improve tertiary roads across the country. The programme will run until 2022. Over US$989 million will be spent on upgrading tertiary roads in Colombia during this period. The country’s tertiary roads network amounts to 142,284km, according to data from Colombia's national road institute (Invias). However, just 6% of these routes are considered in satisfactory condition. More than 133.700km of Colombia’s tertiary roads are in need of vital improvements. Upgrading all the tertiary roads that require improvements would cost in the region of $14.5 billion. In all, Colombia’s road network amounts to some 206,700km.

Meanwhile, Colombia’s national road institute (Invias) is paying $3.08 million for the cost overruns of the La Linea tunnel project. This follows a ruling by a Colombian arbitration tribunal. The sum will be paid to the consortium, Consorcio Conlinea Tres. The consortium comprises Constructora Conconcreto, CSS Constructores and Estyma Estudios y Manejos.

Related Content

  • Brazil opening tender processes for highways, tunnels and road repairs
    July 4, 2014
    A series of tenders for major highway, tunnel and road repair projects are being opened in Brazil. The country’s national transport infrastructure department, DNIT, has set out plans for a series of tenders, all of which form part of phase 2 of the country's growth acceleration plan, PAC. The first of the key projects opening for tender will be the new Morro dos Cavalos tunnel, which will be constructed in the southern state of Santa Catarina. This 1.36km tunnel will be built in the city of Palhoça and form
  • Colombia: Estructura Plural SAC 4G is awarded motorway concession
    July 2, 2015
    Estructura Plural SAC 4G has been awarded the motorway concession Autopista Mar 1 in Colombia. The 176km road between Fernando Gomez Martinez Tunnel will run across San Jeronimo and Santafe, reaching Canasgordas. The project will cost US$565.12 million and have 41 bridges and 17 tunnels. The existing road will be improved and a second lane added between Medellin and Santa Fe. Meanwhile, Colombian construction firm Construcciones El Condor and the national infrastructure agency ANI have signed a pu
  • India road safety plan
    October 14, 2020
    A new plan for road safety in India is being established.
  • Mostotrest won another tender for building of Moscow-St Petersburg highway
    February 20, 2014
    The award for a key stretch of the Moscow-St Petersburg highway has been awarded - Eugene Gerden writes As expected by analysts, Mostotrest, owned by the Rotenberg brothers, won the tender for the construction of the sixth and longest section of the Moscow-St Petersburg highway. Under the conditions of the tender the company will build 209km of the highway (334-543km), which will pass through the Tver and Novgorod regions of Russia. The cost of construction is 144.6 billion Rubles (US$4.51 billion), 16 bill