Skip to main content

Colombia develops tertiary roads plan; cost overruns for La Linea Tunnel

Colombia has a new plan to develop tertiary roads, while cost overruns for the La Linea Tunnel project will be paid for.
By MJ Woof January 28, 2020 Read time: 1 min
Colombia is to improve its tertiary roads to boost connectivity; Image © courtesy of Marcos Souza, Dreamstime

Colombia has set out plans to improve tertiary roads across the country. The programme will run until 2022. Over US$989 million will be spent on upgrading tertiary roads in Colombia during this period. The country’s tertiary roads network amounts to 142,284km, according to data from Colombia's national road institute (Invias). However, just 6% of these routes are considered in satisfactory condition. More than 133.700km of Colombia’s tertiary roads are in need of vital improvements. Upgrading all the tertiary roads that require improvements would cost in the region of $14.5 billion. In all, Colombia’s road network amounts to some 206,700km.

Meanwhile, Colombia’s national road institute (Invias) is paying $3.08 million for the cost overruns of the La Linea tunnel project. This follows a ruling by a Colombian arbitration tribunal. The sum will be paid to the consortium, Consorcio Conlinea Tres. The consortium comprises Constructora Conconcreto, CSS Constructores and Estyma Estudios y Manejos.

Related Content

  • Colombia construction contract for Spanish firm
    July 11, 2017
    Spanish contractor Sacyr Concesiones will carry out construction of Colombia’s new Cucuta-Pamplona road connection in a deal worth US$485.5 million. This particular road project is of key national importance as it will improve Colombia’s connections with neighbouring Venezuela and Ecuador. The project forms of Colombia’s key 4G road development programme and the package of works was awarded by the National Infrastructure Agency (ANI).
  • Melbourne picks PPP deal for roads between Werribee and Footscray
    November 14, 2016
    The Australian city of Melbourne has laid out plans for a US$1.4 billion public-private partnership to revamp major city streets. Melbourne is the capital and most populous city in the state of Victoria, and, with around 4.6 million people, the second most populous city in Australia. Some areas of Melbourne are growing by up to 6% a year. More than 700km of suburban roads will be upgraded by 2022 as part of the 20-year construction and maintenance package, said state premier Daniel Andrews. Eight h
  • Important road works for Slovakia
    July 6, 2023
    Important road connection works are underway for Slovakia.
  • Province halts planned Vancouver bridge to replace Massey Tunnel
    September 14, 2017
    Canada’s province of British Columbia has stopped procurement for a proposed 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. Local media said the province would pay $1.65 million to two of the three shortlisted consortia which had already submitted bids for what is officially called the George Massey Tunnel Replacement project.