Skip to main content

Colombia develops tertiary roads plan; cost overruns for La Linea Tunnel

Colombia has a new plan to develop tertiary roads, while cost overruns for the La Linea Tunnel project will be paid for.
By MJ Woof January 28, 2020 Read time: 1 min
Colombia is to improve its tertiary roads to boost connectivity; Image © courtesy of Marcos Souza, Dreamstime

Colombia has set out plans to improve tertiary roads across the country. The programme will run until 2022. Over US$989 million will be spent on upgrading tertiary roads in Colombia during this period. The country’s tertiary roads network amounts to 142,284km, according to data from Colombia's national road institute (Invias). However, just 6% of these routes are considered in satisfactory condition. More than 133.700km of Colombia’s tertiary roads are in need of vital improvements. Upgrading all the tertiary roads that require improvements would cost in the region of $14.5 billion. In all, Colombia’s road network amounts to some 206,700km.

Meanwhile, Colombia’s national road institute (Invias) is paying $3.08 million for the cost overruns of the La Linea tunnel project. This follows a ruling by a Colombian arbitration tribunal. The sum will be paid to the consortium, Consorcio Conlinea Tres. The consortium comprises Constructora Conconcreto, CSS Constructores and Estyma Estudios y Manejos.

Related Content

  • Wide variations in Europe's road safety figures
    May 14, 2012
    Road safety in Romania continues to be a major issue, with the country seeing more deaths in 2009 than in 2001. A study by the European Transport Safety Council (ETSC) shows that Romanian roads are eight times more dangerous than similar links in Sweden, which has Europe’s best record for road safety (see also Safety Report). Romania, along with Malta, has bucked a trend within Europe of reducing road accidents levels between 2001 and 2009 according to the report. However, while Malta’s road fatality rate
  • McBains Cooper wins PPP consultancy contract in Medellin, Colombia
    May 18, 2016
    Construction consultants McBains Cooper has won a contract to help improve public-private partnership skill for the Colombian city of Medellin. McBains will train Medellin PPP Agency to help implement PPP procured projects in the city, Colombia’s second largest. Apart from road works that will include a new urban highway, projects will be across the transportation sector as well as in education such as school construction. Santiago Klein, international director at McBains Cooper, said the objective of
  • Colombia tunnel delays continue
    September 26, 2016
    Further delays have hit the project to build the La Linea Road Tunnel in Colombia. As a result the tunnel will not be open to traffic until the first half of 2018. This is the latest in a series of delays that have held back the opening of the tunnel. Previous delays have been caused by the discovery of geological conditions that were far more challenging than originally expected as well as problems over insurance cover for the construction firms. When open to traffic the new link will stretch 8.6km and wil
  • Demand diversity in the construction equipment sector
    June 1, 2015
    Demand within the global construction equipment manufacturing industry is anything but homogenous, with certain countries and sales regions significantly outperforming others, with a whole host of factors fuelling and suppressing each key market - Guy Woodford reports