Skip to main content

Colombia develops tertiary roads plan; cost overruns for La Linea Tunnel

Colombia has a new plan to develop tertiary roads, while cost overruns for the La Linea Tunnel project will be paid for.
By MJ Woof January 28, 2020 Read time: 1 min
Colombia is to improve its tertiary roads to boost connectivity; Image © courtesy of Marcos Souza, Dreamstime

Colombia has set out plans to improve tertiary roads across the country. The programme will run until 2022. Over US$989 million will be spent on upgrading tertiary roads in Colombia during this period. The country’s tertiary roads network amounts to 142,284km, according to data from Colombia's national road institute (Invias). However, just 6% of these routes are considered in satisfactory condition. More than 133.700km of Colombia’s tertiary roads are in need of vital improvements. Upgrading all the tertiary roads that require improvements would cost in the region of $14.5 billion. In all, Colombia’s road network amounts to some 206,700km.

Meanwhile, Colombia’s national road institute (Invias) is paying $3.08 million for the cost overruns of the La Linea tunnel project. This follows a ruling by a Colombian arbitration tribunal. The sum will be paid to the consortium, Consorcio Conlinea Tres. The consortium comprises Constructora Conconcreto, CSS Constructores and Estyma Estudios y Manejos.

Related Content

  • Central Asia’s need for improved transport infrastructure
    October 5, 2018
    Central Asia has a need for improved transport infrastructure to help develop economies - Gordon Feller reports
  • Middle East funding for Indian roads
    February 15, 2016
    Funding from the Middle East looks set to help develop new Indian highway projects. Some $15.6 billion from the Abu Dhabi Investment Authority (ADIA), a UAE-based sovereign wealth fund, will be directed towards highway projects in India. This will be used for 50 highway projects in India on a toll-operate-transfer (TOT) basis. The Indian Government is planning to award 104 highway projects under the TOT model that will allow investments by private equity firms, infrastructure developers and institutional in
  • Transport plans for Indonesia
    November 28, 2012
    Indonesia’s Government is setting a US$20 billion budget for transport and energy sector development. The Indonesian Government plans to build 559km of new roads as part of a new transport infrastructure programme. Indonesia’s capital Jakarta faces a growing problem due to severe traffic congestion, which is particularly intense at peak periods. Increasing vehicle numbers in the city mean that the existing traffic problem is fast getting worse. The authorities are looking at policies to address the issue.
  • Congestion and safety concerns over Serbia’s roads
    February 23, 2012
    With traffic flows on the increase, Serbia needs to improve its road network and safety record, reports Gordon Feller. Serbia's road network needs to upgrade its road system against the backdrop of increased traffic flows. Serbia is crossed by segments of the important Trans European network (TEN). Corridor X with its branches Xb (Belgrade-Budapest) Xc (Nis-Sofia), and Xd (Nis-Presevo), represent the most important transit routes in the Republic, connecting Austria/Hungary, Slovenia/Croatia, and Bulgaria/Ma