Skip to main content

Colombia develops tertiary roads plan; cost overruns for La Linea Tunnel

Colombia has a new plan to develop tertiary roads, while cost overruns for the La Linea Tunnel project will be paid for.
By MJ Woof January 28, 2020 Read time: 1 min
Colombia is to improve its tertiary roads to boost connectivity; Image © courtesy of Marcos Souza, Dreamstime

Colombia has set out plans to improve tertiary roads across the country. The programme will run until 2022. Over US$989 million will be spent on upgrading tertiary roads in Colombia during this period. The country’s tertiary roads network amounts to 142,284km, according to data from Colombia's national road institute (Invias). However, just 6% of these routes are considered in satisfactory condition. More than 133.700km of Colombia’s tertiary roads are in need of vital improvements. Upgrading all the tertiary roads that require improvements would cost in the region of $14.5 billion. In all, Colombia’s road network amounts to some 206,700km.

Meanwhile, Colombia’s national road institute (Invias) is paying $3.08 million for the cost overruns of the La Linea tunnel project. This follows a ruling by a Colombian arbitration tribunal. The sum will be paid to the consortium, Consorcio Conlinea Tres. The consortium comprises Constructora Conconcreto, CSS Constructores and Estyma Estudios y Manejos.

Related Content

  • IRF cooperation agreement with Columbia
    February 9, 2012
    IRF Washington announces strategic cooperation agreement with the Colombian Chamber of Infrastructure The IRF Washington Program Center (IRF WPC) and the Colombian Chamber of Infrastructure (CCI) have announced their intent to sign a Memorandum of Understanding (MOU) to cooperate on technology transfer, training and dissemination of best-practices in Colombia
  • US$443 million Medellin tunnel
    July 31, 2024
    A US$443 million road tunnel is planned for Medellin.
  • Colombia road and tunnel connection to Medellin Airport
    September 13, 2017
    Work is well underway on a new road and tunnel project, which will provide an improved connection between the Colombian city of Medellin and its airport. The new link will measure 24km long in all and the construction work is expected to cost over US$342 million, with completion due at the end of 2018. The project is known overall as the Oriente Tunnel, with the work being carried out as a concession by Concesion Tunel Aburrá-Oriente. The project comprises four sections in all. These are the 786m Seminario
  • Colombian infrastructure projects boost
    February 22, 2022
    Colombian infrastructure projects will be boosted with new budget.