Skip to main content

Colombia develops tertiary roads plan; cost overruns for La Linea Tunnel

Colombia has a new plan to develop tertiary roads, while cost overruns for the La Linea Tunnel project will be paid for.
By MJ Woof January 28, 2020 Read time: 1 min
Colombia is to improve its tertiary roads to boost connectivity; Image © courtesy of Marcos Souza, Dreamstime

Colombia has set out plans to improve tertiary roads across the country. The programme will run until 2022. Over US$989 million will be spent on upgrading tertiary roads in Colombia during this period. The country’s tertiary roads network amounts to 142,284km, according to data from Colombia's national road institute (Invias). However, just 6% of these routes are considered in satisfactory condition. More than 133.700km of Colombia’s tertiary roads are in need of vital improvements. Upgrading all the tertiary roads that require improvements would cost in the region of $14.5 billion. In all, Colombia’s road network amounts to some 206,700km.

Meanwhile, Colombia’s national road institute (Invias) is paying $3.08 million for the cost overruns of the La Linea tunnel project. This follows a ruling by a Colombian arbitration tribunal. The sum will be paid to the consortium, Consorcio Conlinea Tres. The consortium comprises Constructora Conconcreto, CSS Constructores and Estyma Estudios y Manejos.

Related Content

  • Colombia’s key 4G road projects underway
    January 5, 2018
    Colombia is moving ahead with its 4G programme, as nine of the 30 key projects in the road development scheme now financially secured. The remaining 21 projects are now being built, while 25 of the projects from the 1G, 2G and 3G schemes are already in use, having expanded Colombia’s network by a total of 3,743km. Colombia's National Infrastructure Agency (ANI) says that 10 projects are being carried out entirely with private funding. In addition, over the last seven years, 48km of tunnels and 430 bridges
  • New Algerian routes
    November 27, 2012
    A major new expressway will link Tizi-Ouzou in Algeria to the country’s East-West highway. The local authorities have been given a budget of US$623 million for the project. The expressway will connect to the East-West highway at Bouira. The project forms part of the 2010-14 five year plan and is required as the existing route linking Tizi-Ouzou to the East-West highway, the TN 12, is now carrying more vehicles than it was designed for. Meanwhile a feasibility study has been completed for a new six-lane high
  • Costa Rica to replace Conavi with a National Infrastructure Institute
    March 14, 2016
    Amid concerns over the efficiency of Costa Rica’s highways agency Conavi, the authority has been given more time to provide details on expansion of Route 32, according to the La Republica newspaper. Conavi has been at loggerheads with the Treasury Inspector's Office which wants Conavi to move faster and authorise a contract for the expansion of road between Rio Frio and Limon granted to China Harbour Engineering Company. China Harbour has been requesting further details about the US$395 million projec
  • Chile’s new urban highway link
    May 2, 2022
    Nestling in a valley beside the Andes mountain range, Santiago has a growing population and has suffered from increasingly heavy congestion in recent years, requiring a new urban road link for which safety has been set as a priority for drivers - *iRAP reports