Skip to main content

Colombia develops tertiary roads plan; cost overruns for La Linea Tunnel

Colombia has a new plan to develop tertiary roads, while cost overruns for the La Linea Tunnel project will be paid for.
By MJ Woof January 28, 2020 Read time: 1 min
Colombia is to improve its tertiary roads to boost connectivity; Image © courtesy of Marcos Souza, Dreamstime

Colombia has set out plans to improve tertiary roads across the country. The programme will run until 2022. Over US$989 million will be spent on upgrading tertiary roads in Colombia during this period. The country’s tertiary roads network amounts to 142,284km, according to data from Colombia's national road institute (Invias). However, just 6% of these routes are considered in satisfactory condition. More than 133.700km of Colombia’s tertiary roads are in need of vital improvements. Upgrading all the tertiary roads that require improvements would cost in the region of $14.5 billion. In all, Colombia’s road network amounts to some 206,700km.

Meanwhile, Colombia’s national road institute (Invias) is paying $3.08 million for the cost overruns of the La Linea tunnel project. This follows a ruling by a Colombian arbitration tribunal. The sum will be paid to the consortium, Consorcio Conlinea Tres. The consortium comprises Constructora Conconcreto, CSS Constructores and Estyma Estudios y Manejos.

Related Content

  • Colombia infrastructure expansion plan underway
    August 22, 2017
    Colombia is moving ahead steadily with its 4G road development scheme. According to the Colombian Chamber of Infrastructure (CCI), the Colombian Government has awarded 31 of the 4G projects to date. And of these 31 projects, 21 are being built at present with another eight in the process of securing financing. In all these 21 active projects and the eight close to commencement are worth a total of US$4.37 billion. The Colombian Government hopes that financing will be secured for a further two projects by th
  • Lower Thames Crossing gets green light
    March 26, 2025
    The 14.5-mile project near London will include a 2.6-mile tunnel under the Thames River and come at a cost of around £8.3 billion.
  • Vinci buys Peruvian toll concession holder Lamsac from Invepar
    August 9, 2016
    Vinci Highways has acquired Peruvian toll road operator Lamsac from the Brazilian group Invepar for around US$1.67 billion. The deal is for 100% of Lamsac which is the concessionaire of the Línea Amarilla toll road in the centre of the Peruvian capital Lima. Vinci Highways, which is Vinci Concessions’ international highways subsidiary, also gets the Peruvian company PEX, Lamsac’s electronic toll collection operator. A statement from Vinci said that Lamsacholds a concession contract with the municipali
  • Colombian connections boost road building
    February 23, 2012
    Colombia continues to invest heavily in its transport connections, with the prospect of more contracts to come.