Skip to main content

Colombia bridge collapse closes route stretch

A bridge on Colombia’s Bogota-Villavicencio collapsed with the deaths of 10 personnel. This has caused the closure of the route close to the El Naranjal tolling area to all but emergency vehicles. in Meta department. The Chirajara Bridge forms part of the project to construct the road to connect capital Bogota with Villavicencio. The National Infrastructure Agency (ANI) held an emergency meeting with road concessionaire Coviandes, which is managing the project to construct the bridge.
January 22, 2018 Read time: 1 min

A bridge on Colombia’s Bogota-Villavicencio collapsed with the deaths of 10 personnel. This has caused the closure of the route close to the El Naranjal tolling area to all but emergency vehicles. in Meta department. The Chirajara Bridge forms part of the project to construct the road to connect capital Bogota with Villavicencio. The National Infrastructure Agency (ANI) held an emergency meeting with road concessionaire Coviandes, which is managing the project to construct the bridge.

Related Content

  • Funds released to repair Skagit Rover Bridge in Washington State
    June 19, 2013
    Some US$15.6 million in federal emergency funds is being made available to Washington State to help repair the Interstate 5 bridge over the Skagit River, which collapsed on May 23rd 2013. The funds were released by US Transportation Secretary Ray LaHood. A section of the four-lane bridge, located around 100km north of Seattle, collapsed into the water, disrupting travel in both directions. This funding follows $1 million in quick release emergency relief provided the day after the collapse. The Washington
  • Team assessing bridge collapse risk
    June 11, 2024
    A team from John Hopkins University is assessing bridge collapse risk in the US.
  • New bridge project for El Salvador
    May 18, 2018
    Several new road bridges are being built in El Salvador’s La Paz Department as part of a highway improvement project.
  • Colombia: more money for Toyo Tunnel Project
    April 4, 2024
    The Toyo Tunnel Project – the Guillermo Gaviria Echeverri Tunnel Project - covers 18.3km including new roads and is under construction by Consorcio Antioquia al Mar.