Skip to main content

Colombia bridge a cause for concern

The Hisgaura Bridge in Colombia remains a source of concern over its structure. The 653m bridge forms part of the Málaga—Los Curos highway and features the longest central span, at 400m, of any cable-stayed bridge in South America. However, Colombia's National Road Institute (Invias) has expressed its doubts over the bridge. Instability and potential high maintenance costs have been cited by Invias as grounds for this concern. The deck of the central section of the bridge is not properly level. It is not c
February 26, 2019 Read time: 1 min

The Hisgaura Bridge in Colombia remains a source of concern over its structure. The 653m bridge forms part of the Málaga—Los Curos highway  and features the longest central span, at 400m, of any cable-stayed bridge in South America. However, Colombia's National Road Institute (2812 Invias) has expressed its doubts over the bridge. Instability and potential high maintenance costs have been cited by Invias as grounds for this concern. The deck of the central section of the bridge is not properly level. It is not clear if this can be repaired or if it will have to be rebuilt.

For more information on companies in this article

Related Content

  • Mersey Gateway Bridge has won IABSE’s Outstanding Structure Award
    June 25, 2019
    The UK’s Mersey Gateway Bridge has picked up the Outstanding Structure Award 2019 from IABSE, the International Association for Bridge and Structural Engineering*. Judges described the bridge, designed by Cowi, as "an elegantly integrated solution for a multi-span concrete cable stay bridge in which form follows function". "Everyone involved with the design and construction the Mersey Gateway Bridge over the past six years knows that this is an incredibly special structure,” said Paul Sanders, Cowi’s
  • Mersey Gateway Bridge has won IABSE’s Outstanding Structure Award
    September 19, 2019
    The UK’s Mersey Gateway Bridge has picked up the Outstanding Structure Award 2019 from IABSE, the International Association for Bridge and Structural Engineering* Judges described the bridge, designed by Cowi, as "an elegantly integrated solution for a multi-span concrete cable stay bridge in which form follows function". "Everyone involved with the design and construction the Mersey Gateway Bridge over the past six years knows that this is an incredibly special structure,” said Paul Sanders, Cowi’s p
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo
  • Tunnel for Colombia’s Calarca – Cajamarca Highway
    May 23, 2014
    A new tunnel is forming an important link for a major Colombian highway - Mauro Nogarin reports Work on a major highway project is underway in Colombia, forming part of the Bogota-Buenaventura Corridor. The highway has a length of 503km and is located in central Colombia, connecting the departments of Tolima and Quindio, across the central Andes, with a total cost of around US$330 million. A key section of the project consists of building a unidirectional tunnel of approximately 8.65km in length. Anot