Skip to main content

Collapsed Italian bridge to be replaced

Plans are being drawn up for a new structure to replace the Morandi Bridge in Italy, which collapsed recently with disastrous results. The Italian road firm Autostrade per l'Italia (ASPI) has a draft design that features eight supports, unlike the failed Morandi Bridge, which was designed with 11 supports. The new bridge design also includes a deck that features emergency lanes, which were not included on the old Morandi Bridge.
September 5, 2018 Read time: 1 min
Plans are being drawn up for a new structure to replace the Morandi Bridge in Italy, which collapsed recently with disastrous results. The Italian road firm 3623 Autostrade per l'Italia (ASPI) has a draft design that features eight supports, unlike the failed Morandi Bridge, which was designed with 11 supports. The new bridge design also includes a deck that features emergency lanes, which were not included on the old Morandi Bridge.


Meanwhile a plan has also been drawn up for the removal of the failed Morandi Bridge structure. Different demolition techniques will be utilised to remove the damaged structure, including the use of hydraulic cutting equipment and breakers mounted on long reach excavators for controlled demolition, as well as tightly-controlled blasting. One section of the failed bridge stands above housing and presents particular challenges to its safe removal. Should the demolition work go to plan, the structure should be removed by October 2018.

For more information on companies in this article

Related Content

  • Italian viaduct job for Conjet
    July 4, 2012
    The multi-span reinforced concrete viaduct at Torano, about 100km east of the Italian capital Rome, is a major structure on the main E80/A24/A25 Autostrada crossing central Italy. The Viadotto Fiume Salto was opened in the late 1960s, but the use of de-icing salts during winter months has since caused considerable calcium chloride damage to the structure forcing the Italian Highways Authority and the Autostrada di Parchi's owner Toto to carry out extensive repairs. The renovation estimated at around €5 mill
  • Austria’s challenging highway bridge replacement
    January 20, 2025
    A challenging highway bridge replacement is planned for Austria.
  • New demolition excavators
    April 29, 2025
    Extended reach excavators offers versatility for demolition works, with new models now available
  • Challenging bridge demolition
    March 2, 2012
    DEMOLITION and blasting experts Philipp Halter of Berlin, Germany, faced a challenging job: in just 48 hours it had to demolish the southern section of the Spandau Dam Bridge crossing the A 100. The efficient interaction of Atlas Copco hydraulic breakers and hydraulic CombiCutters, mounted on seven Volvo excavators, is said to have played a crucial role after following a carefully planned schedule. During Friday night a bed of sand was placed under the bridge to allow the girders and reinforcements torn dow