Skip to main content

Colas and He-Do win Jaszbereny bypass

The 4.5-km bypass will be built between Hungary’s number 31 and 32 main roads.
By David Arminas April 27, 2020 Read time: 1 min
Jaszbereny, in Hungary, to get a bypass road (photo © Butenkow/Dreamstime)

Colas, through its Hungarian subsidiary, and HE-DO have won a tender for construction of a bypass road around Jaszbereny, about 60km from Budapest.

The 4.5-km long road section is to be built between the number 31 and 32 main roads and will include a 66m bridge over the river Zagyva.

The tender was called by the Hungarian national infrastructure development company NIF and is worth around €15.2 million (US$17.5 million), according to national media.

For more information on companies in this article

Related Content

  • Tenders in for Budapest’s Chain Bridge
    September 17, 2020
    Work on the 19th century Széchenyi Chain Bridge could start in March.
  • Cengiz wins Corridor VC contract in Bosnia
    March 21, 2023
    Cengiz submitted the lowest bid in the tender which attracted three offers in the deal said to be worth around €361.8 million, according to Bosnia’s state highways agency Autoceste.
  • Mostotrest won another tender for building of Moscow-St Petersburg highway
    February 20, 2014
    The award for a key stretch of the Moscow-St Petersburg highway has been awarded - Eugene Gerden writes As expected by analysts, Mostotrest, owned by the Rotenberg brothers, won the tender for the construction of the sixth and longest section of the Moscow-St Petersburg highway. Under the conditions of the tender the company will build 209km of the highway (334-543km), which will pass through the Tver and Novgorod regions of Russia. The cost of construction is 144.6 billion Rubles (US$4.51 billion), 16 bill
  • STRABAG wins tricky Polish project
    March 21, 2012
    Austrian construction firm STRABAG has won a major road contract from Poland’s General Directorate for National Roads and Highways (GDDKiA). The deal is for the construction of a 40km section of the S8 Expressway between Walichnowy and Sieradz Poùudnie, some 240km to the south west of capital Warsaw.