Skip to main content

Colas and He-Do win Jaszbereny bypass

The 4.5-km bypass will be built between Hungary’s number 31 and 32 main roads.
By David Arminas April 27, 2020 Read time: 1 min
Jaszbereny, in Hungary, to get a bypass road (photo © Butenkow/Dreamstime)

Colas, through its Hungarian subsidiary, and HE-DO have won a tender for construction of a bypass road around Jaszbereny, about 60km from Budapest.

The 4.5-km long road section is to be built between the number 31 and 32 main roads and will include a 66m bridge over the river Zagyva.

The tender was called by the Hungarian national infrastructure development company NIF and is worth around €15.2 million (US$17.5 million), according to national media.

For more information on companies in this article

Related Content

  • Metro Pacific pushes for Cebu-Mactan bridge in the Philippines
    January 19, 2015
    Metro Pacific Investments Corp (MPIC) is in discussions to form a joint venture for construction of a toll bridge connecting the islands of Mactan and Cebu in the Philippines. Cebu is an island province that incorporates 167 surrounding islands and islets, one of them being Mactan, which lies immediately off Cebu Island, across from Cebu City. MPIC’s subsidiary, Metro Pacific Tollways Development Corp (MPTDC), is proposing an 8.3km bridge costing around US$380 million, according to local media reports
  • Germany’s Salierbrücke bridge reopens
    December 1, 2021
    Extensive upgrading of the Salier Bridge was commissioned by Karlsruhe city council in 2019.
  • A new highway for northern Colombia
    July 17, 2023
    The Pamplona-Cúcuta highway is playing an important role for the development of northern Colombia
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.