Skip to main content

Colas and He-Do win Jaszbereny bypass

The 4.5-km bypass will be built between Hungary’s number 31 and 32 main roads.
By David Arminas April 27, 2020 Read time: 1 min
Jaszbereny, in Hungary, to get a bypass road (photo © Butenkow/Dreamstime)

Colas, through its Hungarian subsidiary, and HE-DO have won a tender for construction of a bypass road around Jaszbereny, about 60km from Budapest.

The 4.5-km long road section is to be built between the number 31 and 32 main roads and will include a 66m bridge over the river Zagyva.

The tender was called by the Hungarian national infrastructure development company NIF and is worth around €15.2 million (US$17.5 million), according to national media.

For more information on companies in this article

Related Content

  • Causeway and immersed road for LagoonHull
    December 1, 2021
    The agency proposing the UK’s LagoonHull project says it’s development and construction costs could be between €1.2-2.4 billion.
  • Checking up on the Czech Republic's Via Salis
    May 20, 2022
    Construction of the Via Salis, the Czech Republic’s first public-private partnership for a road project, is on schedule, according to VINCI which is leading the construction and operating consortium.
  • Sunderland’s New Wear Crossing takes shape
    February 16, 2017
    The New Wear Crossing will be the first bridge to be built over the River Wear in Sunderland, UK, for more than 40 years Raising the bridge’s 100m-tall pylon promised to be a stunning visual sight, but also a tricky operation dictated by extremely variable local weather. World Highways went to press just before the operation, but not before the pylon had arrived by barge on January 7. It had completed a two-day crossing of the often unpredictable North Sea from the Belgian port of Ghent where it was f
  • Estonia: Nordecon to reconstruct Haabersti road intersection
    April 5, 2017
    The Estonian capital Tallinn, announced that Nordecon is the winner in the €19.8 million tender for reconstruction of the Haabersti road intersection. As part of the reconstruction, two tunnels - 38m and 54m – will be built for cyclists and pedestrians. Phase one of the project includes a 277m-long road bridge in the direction of Paldiski Road and phase two will construction of a roundabout with traffic lights. The project is co-financed by the EU Cohesion Fund and completion is set for October 201