Skip to main content

Cleveland Bridge wins UK flyover contract

Cleveland Bridge has won a major contract for a flyover in the UK.
By MJ Woof March 26, 2020 Read time: 2 mins
Cleveland Bridge will supply a new flyover, which will form part of a major road improvement scheme in North East England – image © courtesy of Cleveland Bridge

Cleveland Bridge UK will carry out a major contract for a new flyover in North East England. The new structure will be erected in South Tyneside, forming part of Highways England’s A19 Testo’s Junction Improvement Scheme.

The Darlington-based company was awarded the project by Costain to fabricate and install a new 141.4m bridge at the centre of a flyover. 

The wider project is intended to reduce traffic congestion on the redeveloped roundabout that connects the A19 with the A184. The flyover is part of a five-year, £15 billion programme by Highways England to improve journeys between the main North East arterial route and the surrounding areas.

To date two additional lanes on both northbound and southbound sides of the roundabout have been completed, which has also created the space for the construction of the flyover that includes the installation of more than 130 concrete piles.

The road bridge will be fabricated as a series of 25 paired girders at Cleveland Bridge UK’s 27,000m2 production facility, 64km south of the project site.

The scale of Cleveland Bridge UK’s factory will also enable it to undertake a test assembly of the structure, which will ensure a more efficient final installation on site later this year.

Chris Droogan, managing director of Cleveland Bridge UK, commented: “It is always satisfying to secure projects in our home region of the North East, particularly those that will bring significant benefits to the efficiency of the area’s transport network.

Related Content

  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci
  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w
  • Mabey Hire supports the Whorlton Bridge
    June 10, 2025

    Whorlton Bridge in England’s County Durham has had to be closed to traffic while a major programme of works is carried out. Every component is to be removed, refurbished and replaced.

    To facilitate the works, a bespoke catenary system has been installed, with Mabey Hire’s adaptable and modular propping equipment used to construct the temporary structure.

  • Road improvement works are planned for East England
    May 13, 2021
    Road improvement works are being planned between Peterborough and Great Yarmouth.