Skip to main content

Cleveland Bridge wins UK flyover contract

Cleveland Bridge has won a major contract for a flyover in the UK.
By MJ Woof March 26, 2020 Read time: 2 mins
Cleveland Bridge will supply a new flyover, which will form part of a major road improvement scheme in North East England – image © courtesy of Cleveland Bridge

Cleveland Bridge UK will carry out a major contract for a new flyover in North East England. The new structure will be erected in South Tyneside, forming part of Highways England’s A19 Testo’s Junction Improvement Scheme.

The Darlington-based company was awarded the project by Costain to fabricate and install a new 141.4m bridge at the centre of a flyover. 

The wider project is intended to reduce traffic congestion on the redeveloped roundabout that connects the A19 with the A184. The flyover is part of a five-year, £15 billion programme by Highways England to improve journeys between the main North East arterial route and the surrounding areas.

To date two additional lanes on both northbound and southbound sides of the roundabout have been completed, which has also created the space for the construction of the flyover that includes the installation of more than 130 concrete piles.

The road bridge will be fabricated as a series of 25 paired girders at Cleveland Bridge UK’s 27,000m2 production facility, 64km south of the project site.

The scale of Cleveland Bridge UK’s factory will also enable it to undertake a test assembly of the structure, which will ensure a more efficient final installation on site later this year.

Chris Droogan, managing director of Cleveland Bridge UK, commented: “It is always satisfying to secure projects in our home region of the North East, particularly those that will bring significant benefits to the efficiency of the area’s transport network.

Related Content

  • Launch soon for the Sunderland Bridge’s deck across the Wear
    March 24, 2017
    The team constructing the New Wear Crossing near the English city of Sunderland is preparing for the final launch of the 300m bridge deck. In recent weeks, the legs of the 100m-tall centrepiece have been secured to the foundations within the riverbed and most of the rigging used to raise it into place has been removed. While the bridge deck was being painted, the bottoms of both pylon legs were filled with 175tonnes of concrete, The next major process will be to slowly pull the bridge deck out acr
  • Boost to infrastructure, autonomous cars in UK budget
    March 17, 2016
    The UK chancellor announced in his spring budget what he called the biggest investment, US$87.5 billion (£61 billion), in transport infrastructure in generations and is increasing capital investment in the transport network by 50 per cent over this Parliament compared to the last. The government plans to establish the UK as a global centre for excellence in connected and autonomous vehicles by establishing a US$24.1 million (£15 million) ‘connected corridor’ from London to Dover to enable vehicles to com
  • Delta Bloc solution for major upgrade to UK’s M6 motorway
    February 8, 2018
    Delta Bloc’s structural precast concrete barriers have been supplied for a €308 million smart motorway project being undertaken by Highways England on the M6 Motorway. UK contractor Charcon Construction Solutions worked with Delta Bloc UK, which develops, manufactures, supplies and installs permanent and temporary concrete road safety barriers. The Highways England scheme between junction 16 at Crewe and junction 19 at Knutsford has seen a new 32km concrete safety barrier installed in the central reservat
  • Colas UK takes Covid-19 precautions as it starts on Lincoln road contract
    April 8, 2020
    Colas is providing routine and emergency repairs for traffic signals in Lincolnshire county.