Skip to main content

Cleveland Bridge UK’s A14 work shortlisted

The showpiece bridge for A14 project is the 750m-long viaduct over River Great Ouse.
By David Arminas July 15, 2020 Read time: 2 mins
Over the River Great Ouse goes 6,000 tonnes of steel (photo Cleveland Bridge)

Cleveland Bridge UK has been shortlisted in the UK’s Structural Steel Design Awards 2020 for its recent work on A14 Cambridge-to-Huntingdon Improvement Scheme in England.
 
The company was appointed to fabricate and construct six major bridges on the section of the new A14 between the A1 highway and Cambridge city as part of a nearly US$1.9 billion (nearly €1.7 billion) improvement scheme.

One of these is the showpiece bridge, an ambitious 750m-long viaduct over the River Great Ouse. The viaduct required 6,000 tonnes of steel, comprising 76 separate main girders and 800 cross-girders. Most of the main girders were 40m long, 2m deep and weighed 50 tonnes. The bridge was completed on budget and ahead of schedule.

“Effective planning and collaboration were a hallmark of this project, particularly for the more complex bridges,” said Chris Droogan, managing director of Cleveland Bridge UK. It enabled all parties to understand each other’s requirements and to work effectively together to meet and exceed programme times.”

The Structural Steel Design Awards were started in 1969 and the 2020 edition is sponsored by the British Constructional Steelwork Association and Trimble Solutions UK. Entries are open to steel-based structures in the UK or overseas that have been built by UK or Irish steelwork contractors. Winners will be announced in October.

Cleveland Bridge UK’s principal activity is the fabrication and erection of steel bridges, high-rise buildings and other steel structures.  It operates a nearly 9 hectare site in Darlington which features a 27,000m² fabrication plant along with a paint facility. The parent company Cleveland Bridge Group is part of the Al Rashaid Group, with other sites in Dubai, Saudi Arabia, China and India.

Related Content

  • Mabey Hire supports the Whorlton Bridge
    June 10, 2025

    Whorlton Bridge in England’s County Durham has had to be closed to traffic while a major programme of works is carried out. Every component is to be removed, refurbished and replaced.

    To facilitate the works, a bespoke catenary system has been installed, with Mabey Hire’s adaptable and modular propping equipment used to construct the temporary structure.

  • Shortlist set for Lower Thames tunnel work
    April 9, 2021
    Bam Nuttal, Bouygues, Dragados and Hochtief are in the running for the UK project.
  • Super paving with Aggregate Industries’ SuperThin
    February 21, 2019
    Aggregate Industries’ contracting division recently laid a total of 1,800 tonnes of an ultra-low noise asphalt at Brampton Hut Services in Huntingdon in one weekend. Section 1 of Highways England’s A14 Cambridge-to-Huntingdon Improvement Scheme will see 21km of the road upgraded to three lanes in each direction and is expected to cut journey times by up to 20 minutes. The pavement works at Brampton Hut motorway services specified minimum sound level requirements of -7.5db (A). The limits are designed
  • A new Indian cable-stayed bridge will improve transport connections
    March 2, 2015
    A major new cable-stayed bridge is being constructed in India - Partha Bratim Basistha reports. In India the construction of a major cable-stayed bridge is underway that will boost connections from capital Delhi to its surrounding areas. The bridge is being built in a bid to ease growing interstate traffic movement between Delhi and the surrounding North Indian states of Punjab, Uttar Pradesh, Haryana and Himachal Pradesh. Named Signature Bridge, this is a landmark structure due to its design aesthetics and