Skip to main content

Cleveland Bridge on A1 project in the UK

Cleveland Bridge UK has delivered a significant upgrade project on the A1 in North Yorkshire, England, with the fabrication and installation of eight bridges. Using British-made steel, the 20-month project was completed with the installation of the 53m Fort Overbridge. The work was carried out on behalf of Highways England’s principal contractor on the A1 scheme, a Carillion and Morgan Sindall joint venture. The A1 Leeming to Barton upgrade is replacing the dual carriageway with a three-lane motorw
February 7, 2017 Read time: 2 mins
Cleveland Bridge UK has delivered a significant upgrade project on the A1 in North Yorkshire, England, with the fabrication and installation of eight bridges.

Using British-made steel, the 20-month project was completed with the installation of the 53m Fort Overbridge.

The work was carried out on behalf of 8100 Highways England’s principal contractor on the A1 scheme, a 2435 Carillion and 2567 Morgan Sindall joint venture.

The A1 Leeming to Barton upgrade is replacing the dual carriageway with a three-lane motorway. As part of the extensive civil engineering works, the project required a collection of new bridges and extensions to existing structures to accommodate the larger motorway.

From its extensive facility in Darlington, Cleveland fabricated and provided protective treatments to the steel work for the bridges, allowing the newly widened A1 to span existing roads and rivers or carry access roads over the new highway.

The company also undertook the erection and installation of the bridges, which range between 80-400 tonnes. This included the scheme’s largest bridge, the 86.5m-long and 398tonne Kneeton Lane Bridge, near Scotch Corner.

Cleveland also supported the widening of existing structures, most notably the Agricola Bridge. This required an additional 170tonnes of steel to widen the bridge by 7m either side and to a span of 57m.

“This was a highly time-focused project involving the production and installation of around 1,600 tonnes of steel,” said Chris Droogan, managing director of Cleveland Bridge UK. “Working closely with our client we have efficiently completed the delivery of the bridges, which is a significant milestone in this major civil engineering project.”

For more information on companies in this article

Related Content

  • New bridge is spanning China’s Yangtze River
    June 28, 2013
    There is massive development in design and construction of bridges in China and the Yingwuzhou Bridge over the Yangtze River is one key project – Mike Woof reports, with assistance from Route One’s Chinese publishing partner *CMTM Called the Mother River, the Yangtze is a focal point for China politically, economically and culturally. The river has been at the heart of China’s development for millennia, its history stretching back as far as the dawn of human civilisation. The name Yangtze, or Yangzi, is its
  • Fugro uses Traffic Speed Deflectometer scans for Highways England
    November 14, 2016
    Fugro has started scanning structural pavement condition data from lane 2 using Highways England’s Traffic Speed Deflectometer (TSD). This is the first time for such scanning as part of the routine network-wide survey of England’s strategic roads, according to Fugro. The global asset integrity specialist has been carrying out Traffic Speed Structural Surveys (TRASS) since autumn 2014 under a 3-year contract (TRASS 3) - Highways England’s largest ever outsourced contract for pavement structural condit
  • New UK road link planned
    August 25, 2020
    A new UK road project is being planned.
  • Clearview magnetometer trial detects alternative to loops
    October 1, 2019
    An UK investigation into the performance of Clearview Intelligence’s magnetometers as an alternative to inductive loops on MIDAS installations has concluded they deliver like-for-like results.