Skip to main content

Cianbro picks up another contract for Washington’s Memorial Bridge

The 1930’s Arlington Memorial Bridge in Washington, which has carried US presidents and military heroes across the Potomac River to the famous Arlington Cemetery, is to undergo refurbishment, again. Cianbro Corporation, based in the state of Maine and which worked on the bridge in 2013, picked up the contract for US$2,523,520, according to a notice on the FedBizOpps.gov website. The Federal Business Opportunities website had earlier this year asked for submissions for the work: “The project will be sp
July 15, 2015 Read time: 3 mins
Courtesy of National Park Service
The 1930’s Arlington Memorial Bridge in Washington, which has carried US presidents and military heroes across the Potomac River to the famous Arlington Cemetery, is to undergo refurbishment, again.

Cianbro Corporation, based in the state of Maine and which worked on the bridge in 2013, picked up the contract for US$2,523,520, according to a notice on the FedBizOpps.gov website.

The Federal Business Opportunities website had earlier this year asked for submissions for the work: “The project will be split into multiple work schedules/contract options, with the cost of the entire project expected to fall within the price range of $2,000,000 to $5,000,000.”

Earlier this year, the bridge’s owner, the National Park Service, closed two lanes and imposed a weight limit on vehicles pending emergency repairs.

The service says on its website that the bridge was first proposed in 1886 but wasn’t built until 1932. “Today, Memorial Bridge symbolically links North and South in its alignment between the Lincoln Memorial and Arlington House, the Robert E. Lee Memorial.”

In April, the Washington, D.C.-based American Road and Transportation Builders Association (ARTBA) identified the Memorial Bridge as one of more than 61,000 “structurally deficient bridges” in the country but also one of the most significant because of its location.

ARTBA said on its website this month that the latest work will include repair and replacement of structural concrete, steel and timber members. Also included will be installation of additional elastomeric bearing pads, expansion joint repair or replacement, debris removal from bascule span truss members, trunnion posts and the bottom of the trunnion areas. There will be concrete sidewalk repairs, drainage improvements and an ultra-thin bonded asphalt overlay.

Work is expected to continue into next year on the bridge which carries around 55,000 people daily.

A recent report by the Washington Post newspaper reported that the 10ton load limit across the entire length of the bridge “essentially eliminates most bus traffic on the granite-faced, arching landmark”.

The bridge’s condition was embarrassing, the Post noted. “Although tens of thousands of U.S. bridges have been deemed structurally deficient, the functional mess and potent symbolism of a crumbling Memorial Bridge needing emergency repairs had the Washington region’s congressional representatives fuming.”

The Cianbro appointment is the first step in a possible $250 million multiyear repair project that could close the bridge for up to three months, the Post reported.

The structure is a masonry, steel and stone arch bridge with a central bascule. But, as the Post pointed out in April, “the main lever in the Memorial Bridge control room hasn’t opened the draw span in more than 50 years”.

ARTBA, which this year analysed the US Department of Transport’s National Bridge Inventory database, said more than more than 61,000 structurally deficient bridges remain in need of significant repair.

While structurally deficient bridges may not be imminently unsafe, ARTBA said that signs should be posted so the public understands they have structural deficiencies that need repair.

Related Content

  • A thousand birthday greetings for US-Canada Thousand Island Bridge
    August 21, 2018
    The Canada-US Thousand Island Bridge system celebrated its 80th birthday in August with presentations and an open house at its US headquarters. The 33.7km three-bridge system over the St Lawrence River took 16 months to build and was completed 10 weeks ahead of schedule. It runs from Collins Landing near Alexandria Bay in the US state of New York to the small town of Ivy Lea in the Canadian province of Ontario. The system connects US Interstate 81 and Canada’s Highway 401, a major motorway between Montre
  • America faces another major highway funding crisis says TCC
    October 3, 2014
    The United State is facing yet another national highway funding crisis as the country’s new fiscal year begins. Despite the fact that October 1 marked the beginning of America’s new financial year, Congress has still not passed or approved the funding for a new long-term surface transportation measure. This is really worrying the 31-member-strong Transportation Construction Coalition (TCC) which is arguing that a “failure to act” will “lead to another self-imposed funding crisis that would undermine vital r
  • Indeco cuts up New York City’s old Kosciuszko Bridge
    November 23, 2017
    An Indeco ISS 45/90 is proving essential for demolishing the old Kosciuszko Bridge in New York City. New York City’s old 1.9km Kosciuszko Bridge, which crosses Newtown Creek connecting Green Point, Brooklyn with Maspeth, Queens, has been out of service since April. By the end of the year, the polygonal Warren through-truss structure will be no more. To replace the old bridge, in 2009, the New York State Department of Transportation planned the construction of two cable-stayed replacement bridges.
  • Developments in bridge monitoring technology
    July 9, 2012
    Advances in bridge monitoring technology should help ensure structural safety Highly productive, Fugro Aperio's ground penetrating radar system offers accurate scanning of bridge condition Bridge engineers can now benefit from a new technology designed to pinpoint shallow targets, such as masonry fixings, reinforcement bars or delamination between thin layers. This uses the latest high resolution ground penetrating radar (GPR) antenna and has been developed by Cambridge-based Fugro Aperio in the UK. Operati