Skip to main content

Chinese tunnel projects discussed

German Chancellor Angela Merkel and Wen Jiabao, Premier of the People’s Republic of China, recently visited the Herrenknecht plant in Guangzhou as part of her trip to China. The delegation included, among others, 20 high-level representatives of German industry, and Dr Martin Herrenknecht, chairman of Herrenknecht, presented the company to Chancellor Merkel and Premier Wen, and talked about important Chinese and international reference projects.
May 14, 2012 Read time: 2 mins
Seen in front of the Herrenknecht EPB Shield being used for the Metro in Dongguan are visitors to the company's plant including (second from left) Dr Martin Herrenknecht; Dr Angela Merkel (third from left) and Wen Jiabao (fourth from left)
German Chancellor Angela Merkel and Wen Jiabao, Premier of the People’s Republic of China, recently visited the 2592 Herrenknecht plant in Guangzhou as part of her trip to China.

The delegation included, among others, 20 high-level representatives of German industry, and Dr Martin Herrenknecht, chairman of Herrenknecht, presented the company to Chancellor Merkel and Premier Wen, and talked about important Chinese and international reference projects.

In addition, he introduced a tunnel boring machine (TBM), an Earth Pressure Balance Shield with a diameter of 6.95m, which is being used to construct the Metro Line 2 in Dongguan.

Herrenknecht has been represented on the Chinese growth market since the delivery of the first machines for the construction of the Beijing metro in 2000, and the company generates around 20% of its group sales in China.

The huge economic growth and increasing urbanisation result in a high demand for efficient underground traffic and supply infrastructures, and to date Herrenknecht technology has been used in 275 projects, mostly for inner-city tunnel construction. Some 480km of tunnel tubes have been built using its technology, while a further 200km are being planned.

Among the most important projects is the construction of two double-storey traffic tunnels in Shanghai to connect Changxing river island with the mainland, work carried out using two of the world’s biggest TBMs with diameters of 15.43m each.

For more information on companies in this article

Related Content

  • Materials supply problems causing problems, says VDMA
    October 11, 2021
    Construction machinery manufacturers are facing supply issues according to the VDMA
  • Well-educated personnel are the best investment for the future says the Ammann international training centre
    May 20, 2014
    Far too often, managers will view training as a luxury and not as a competitive and strategic necessity. Lazy team leaders regularly argue that it is a waste of time and money training their people, not least because these same trainees might subsequently leave the organisation. Courses are seen as an interruption, and a good way to delay things. There is always something much more pressing and important on the to-do list and staff can end up feeling forced into the training department. But these are weak a
  • HEXAGON LIVE - making the digital world become a reality
    June 3, 2015
    HEXAGON LIVE - the digital world becomes reality. Everyone in the construction and infrastructure maintenance sector faces the same great challenge - create reality with design through efficiency. But, as designs become more complex, how to gain efficiency is the real trick. These challenges are overcome only by people dedicated to solving problems. That puts them among the world’s innovators, said Ola Rollen, chief executive of technology information company Hexagon, during his welcoming keynote address to
  • Geosynthetic drainage technology developments
    June 13, 2012
    An innovative solution to providing vital, low-impact surface water control for one of Britain’s largest local authority road schemes is said to have been recently achieved using Hydro International’s (HI) Hydro Vortex Drop Shaft  ow control technology. The new 7km bypass built by Costain at Church Village, near Pontypridd, South Wales, required careful planning to minimise its effect on the countryside and the local environment. Rhondda Cynon Taff Council needed to bypass Church Village to reduce traf c