Skip to main content

Chinese tunnel projects discussed

German Chancellor Angela Merkel and Wen Jiabao, Premier of the People’s Republic of China, recently visited the Herrenknecht plant in Guangzhou as part of her trip to China. The delegation included, among others, 20 high-level representatives of German industry, and Dr Martin Herrenknecht, chairman of Herrenknecht, presented the company to Chancellor Merkel and Premier Wen, and talked about important Chinese and international reference projects.
May 14, 2012 Read time: 2 mins
Seen in front of the Herrenknecht EPB Shield being used for the Metro in Dongguan are visitors to the company's plant including (second from left) Dr Martin Herrenknecht; Dr Angela Merkel (third from left) and Wen Jiabao (fourth from left)
German Chancellor Angela Merkel and Wen Jiabao, Premier of the People’s Republic of China, recently visited the 2592 Herrenknecht plant in Guangzhou as part of her trip to China.

The delegation included, among others, 20 high-level representatives of German industry, and Dr Martin Herrenknecht, chairman of Herrenknecht, presented the company to Chancellor Merkel and Premier Wen, and talked about important Chinese and international reference projects.

In addition, he introduced a tunnel boring machine (TBM), an Earth Pressure Balance Shield with a diameter of 6.95m, which is being used to construct the Metro Line 2 in Dongguan.

Herrenknecht has been represented on the Chinese growth market since the delivery of the first machines for the construction of the Beijing metro in 2000, and the company generates around 20% of its group sales in China.

The huge economic growth and increasing urbanisation result in a high demand for efficient underground traffic and supply infrastructures, and to date Herrenknecht technology has been used in 275 projects, mostly for inner-city tunnel construction. Some 480km of tunnel tubes have been built using its technology, while a further 200km are being planned.

Among the most important projects is the construction of two double-storey traffic tunnels in Shanghai to connect Changxing river island with the mainland, work carried out using two of the world’s biggest TBMs with diameters of 15.43m each.

For more information on companies in this article

Related Content

  • Tunnel construction benefits from improved visibility
    November 14, 2012
    Major new tunnel construction projects will, on completion, help secure more reliable journey times for hundreds of thousands of people across the world. Meanwhile, as Guy Woodford reports, leading ITS solution companies have been providing vital equipment for major road tunnels The Martina Tunnel Boring Machine (TBM), a 4,500tonne Herrenknecht Earth Pressure Balance Shield said to have a world record diameter of 15.55m, has required just under a year to build the first of two tunnel tubes for the 2.5km lon
  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v
  • Market confidence remains strong in the build-up to bauma China 2012
    May 18, 2012
    Despite a slight slow-down in the pace of economic growth in China, market confidence remains strong in the country. The organisers of the upcoming bauma China event, from November 27 to 30 2012, say that China is still a key market for the global construction sector. Supported by a booming domestic market, the Chinese construction machinery manufacturers are also making ground on the international front. The exhibition is an international trade fair for construction machinery, building material machines, c
  • Building the Pfänder tunnes
    February 10, 2012
    The second tube of the Pfänder Tunnel, Bregenz, Austria, where the new main tunnel has been excavated using a tunnel boring machine (TBM), is being constructed by Alpine BeMo Tunnelling. Tubbings have been installed as the inner tunnel lining, and as part of concreting for the inner shell, the FQ 1 crosscut, suitable for vehicles, is being constructed using a tunnel formwork carriage designed and supplied by PERI.