Skip to main content

Chinese contractor wins major Nigerian road project

A road construction contract worth US$1.07 billion has been awarded to China Railway Construction in Nigeria. The Ministry of Delta Affairs of Nigeria awarded the package of works for Section V of the A121 East-West highway to China Civil Engineering Construction, a division of China Railway Construction. The work is expected to take five years to complete and includes design as well as construction. When it is complete, the A121 will connect Nigeria’s two main North-South highways. Its route runs from the
November 11, 2013 Read time: 3 mins
A road construction contract worth US$1.07 billion has been awarded to 890 China Railway Construction in Nigeria. The Ministry of Delta Affairs of Nigeria awarded the package of works for Section V of the A121 East-West highway to China Civil Engineering Construction, a division of China Railway Construction. The work is expected to take five years to complete and includes design as well as construction. When it is complete, the A121 will connect Nigeria’s two main North-South highways. ITS route runs from the A1 highway at Shagamu in Ogun State to the A2 highway at Benin City in Edo State.

The link that will be built will run through Nigeria’s Niger Delta area. This area has been troubled by instability with a spate of kidnappings and the construction team will likely have to operate with considerable security on hand to ensure safety. The political issues have to a degree been eased but the area still suffers heavily from the activities of armed criminals.

However the construction of this section of highway has been recognised as being or prime economic importance for Nigeria, as it will improve links to the oil producing region that provides the basis of much of the country’s economy. The East-West link is currently around 65% complete, according to reports from Nigeria. Some of the funding for the work has been provided by the 1586 African Development Bank, with the Nigeria’s Federal Government also providing funding.

The completion of the highway will boost the economy of the country’s South East, providing a better link from Nigeria’s economic centre Lagos to the eastern city of Calabar (both cities were formerly Nigeria’s capital at various times in the country’s history). This will reduce journey times and also help to boost trade for the agricultural sector in the highly fertile but depressed areas of Nigeria’s South East. The new highway will also help boost Nigeria’s imports and exports, which currently rely on the port of Lagos. In the future the ports of Port Harcourt, Warri and Calabar will also be able to carry greater quantities of freight. In addition, the highway will give better access to the scenic coastal area for tourism, which should provide a further boost to the economy of the South East of the country.

For more information on companies in this article

Related Content

  • Nepal plans road infrastructure expansion
    March 12, 2014
    Major road expansion is planned for Nepal, but will face huge challenges due to the country’s geography - Mike Woof reports, with local information from World Highways' Nepal correspondent, Ram Krishna Wagle The tiny, landlocked nation of Nepal lies sandwiched between two of the world’s largest countries, China and India and maintains good relations with both. Politically Nepal has strong links with China, while culturally its ties are close with India and these relationships work both ways. Despite bein
  • Highway developments to boost east-west transport
    February 16, 2012
    Huge highway developments are being planned and carried out to further improve East-West transport, with Central Asia a key region as Patrick Smith reports
  • Peruvian highway has highest tunnel
    October 2, 2014
    A new tunnel connection is helping boost connectivity in Peru, improving access to remote areas Building the tunnel has been an important project as Peru has an imbalance in population distribution with 54.6% of its inhabitants concentrated in the areas along the Pacific Ocean, while only 32% of the population lives in the Andes highlands and 13.4% in the Amazon tropical jungles. The imbalance is acute given that the tropical jungle areas account for 60% of the country’s national territory. Economic deve
  • South Eastern Nigerian road project stalls
    July 24, 2019
    Construction work on the upgrade of the road connecting Calabar with Itu and Ikot Ekpene in South East Nigeria has once again ground to a halt. The contractor carrying out the work, Julius Berger, has transferred personnel and equipment to other projects. This action has been taken due to a delay in payments for the work to the contractor. The road is now in extremely poor condition, which is a key problem for transport between Cross River State and Akwa Ibom State. Much of the road is now said to be virt