Skip to main content

Chinese contractor demolishes bridge and housing block

A Chinese demolition contractor carried out an effective and efficient demolition job. The firm brought both a defunct bridge and the tower block next to it down simultaneously using explosives. Residents living nearby were evacuated from their properties for safety but the explosive demolition went according to plan and both the bridge and tower block were brought crashing to the ground in the planned zones but without any injuries.
June 13, 2014 Read time: 1 min
A Chinese demolition contractor carried out an effective and efficient demolition job. The firm brought both a defunct bridge and the tower block next to it down simultaneously using explosives. Residents living nearby were evacuated from their properties for safety but the explosive demolition went according to plan and both the bridge and tower block were brought crashing to the ground in the planned zones but without any injuries.

Related Content

  • Bridge and tunnel concrete testing vital for longevity
    July 9, 2012
    Modern technology is making testing more efficient and reliable, increasing productivity and reducing costs, as Patrick Smith reports A few years ago, visual inspection of an 18-year-old bridge by ARRB in Australia identified considerable cracking in the precast, prestressed deck planks as well as in the cast in situ deck overlay. Laboratory examination indicated that the deck planks and the deck overlay were suffering from a strong case of alkali-aggregate reaction (AAR). Testing of concrete cores drilled
  • Roads to Recovery after the pandemic
    January 11, 2021
    IRF president Bill Halkias shares the Federation’s view on post-Covid
  • Building Tomorrow’s Transport Infrastructure Today – IRF Global in Washington
    May 2, 2018
    Preparations are underway for the world’s leading road, tunnel and bridge exhibition Produced by the International Road Federation, the IRF Global Road2Tunnel Expo & Conference is the only international conference and tradeshow of its kind dedicated to road, tunnel and bridge construction. “Technology and innovations are evolving at a pace never seen before in the history of the road and transport sector” noted IRF president & CEO C Patrick Sankey. “From innovations in materials, such as self-healing con
  • New M90 surfacing in the UK gain praise
    January 8, 2013
    Early evaluation of surfacing work on the M90 at Rosyth – the first major application of Scotland’s new TS2010 specification – has earned positive praise. Transport Scotland’s determination to obtain pavement that is durable, long lasting and safe (especially in early life) is clearly apparent on the M90 just north of the Forth Road Bridge. Here surfacing has been carried out this spring to TS2010, a tough new specification designed to ensure thin surfacing pavements that work. And the initial prognosis is