Skip to main content

Chinese contractor demolishes bridge and housing block

A Chinese demolition contractor carried out an effective and efficient demolition job. The firm brought both a defunct bridge and the tower block next to it down simultaneously using explosives. Residents living nearby were evacuated from their properties for safety but the explosive demolition went according to plan and both the bridge and tower block were brought crashing to the ground in the planned zones but without any injuries.
June 13, 2014 Read time: 1 min
A Chinese demolition contractor carried out an effective and efficient demolition job. The firm brought both a defunct bridge and the tower block next to it down simultaneously using explosives. Residents living nearby were evacuated from their properties for safety but the explosive demolition went according to plan and both the bridge and tower block were brought crashing to the ground in the planned zones but without any injuries.

Related Content

  • Managing urban motorway complexity in Sydney
    October 4, 2012
    Sydney’s Hills M2 motorway is being widened while still carrying traffic and meeting tough environmental criteria More than 100,000 vehicles and over 27,000 bus commuters use the Hills M2 motorway on a typical workday, making it one of Sydney’s busiest motorway corridors. Owned and managed by Hills Motorway Ltd (HML) and a key part of the city’s orbital motorway network, the road stretches over 21km, providing a seamless link between the Lane Cove Tunnel and Westlink M7. The Hills M2 Upgrade is one of many
  • Barriers to safety
    April 1, 2021
    All vehicle restraint devices on European roads are – or should be - certified according to the European impact standard EN 1317, implying conformity. But it doesn’t necessarily ensure that the crash barrier will perform its main aim of saving the vehicle occupants’ lives.
  • Advanced method for South Africa bridge construction
    May 16, 2016
    A sophisticated construction method has been used for the first time in South Africa for a suspended bridge project This novel method of bridge construction was used on a major road upgrade project for the South African National Roads Agency Limited (SANRAL). Main contractor Lonerock Construction, and subcontractor Tzandeboo Construction, used RMD Kwikform’s Megatruss system to construct a 60m-long bridge while suspended mid-air over the live N4 highway. Lonerock Construction’s US$8.5 million (R132
  • Advanced method for South Africa bridge construction
    May 16, 2016
    A sophisticated construction method has been used for the first time in South Africa for a suspended bridge project This novel method of bridge construction was used on a major road upgrade project for the South African National Roads Agency Limited (SANRAL). Main contractor Lonerock Construction, and subcontractor Tzandeboo Construction, used RMD Kwikform’s Megatruss system to construct a 60m-long bridge while suspended mid-air over the live N4 highway. Lonerock Construction’s US$8.5 million (R132