Skip to main content

Chinese contractor demolishes bridge and housing block

A Chinese demolition contractor carried out an effective and efficient demolition job. The firm brought both a defunct bridge and the tower block next to it down simultaneously using explosives. Residents living nearby were evacuated from their properties for safety but the explosive demolition went according to plan and both the bridge and tower block were brought crashing to the ground in the planned zones but without any injuries.
June 13, 2014 Read time: 1 min
A Chinese demolition contractor carried out an effective and efficient demolition job. The firm brought both a defunct bridge and the tower block next to it down simultaneously using explosives. Residents living nearby were evacuated from their properties for safety but the explosive demolition went according to plan and both the bridge and tower block were brought crashing to the ground in the planned zones but without any injuries.

Related Content

  • Efficient bridge demolition in China
    March 31, 2014
    A contractor in China has completed an effective bridge demolition job efficiently and quickly. The pre-weakened structure was brought crashing into the river it spanned following one final push using the boom of an excavator. The defunct bridge collapsed in a controlled fashion without injury or inconvenience, allowing the rubble to be removed in a subsequent operation.
  • Contractor uses explosives to demolish Brazilian overpass
    December 2, 2013
    A demolition contractor has carried out an explosive demolition on an overpass in Brazilian city, Rio de Janeiro. The demolition work is being carried out as part of the upgrades to the city’s port district in preparation for the 2016 Olympic Games. Around 1tonne of explosives were used to place charges at key points within the structure of the Perimetral overpass. The demolition work was successful and the structure was brought down safely without incident.
  • High speed bridge demolition minimises disruption
    February 16, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.
  • High speed bridge demolition minimises disruption
    April 13, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.