Skip to main content

China’s US$3.85bn Ya'an-Kangding highway to be completed in 2017

The construction of China’s US$3.85 billion (CNY 23.59 billion) Ya'an-Kangding highway will be completed and put into operation during 2017. Meanwhile, the environmental impact assessment (EIA) report for the 133.97km highway project is said to have been completed.
September 18, 2013 Read time: 1 min
The construction of China’s US$3.85 billion (CNY 23.59 billion) Ya'an-Kangding highway will be completed and put into operation during 2017. Meanwhile, the environmental impact assessment (EIA) report for the 133.97km highway project is said to have been completed.

Related Content

  • LiuGong embraces Industry 4.0
    November 27, 2018
    LiuGong chairman Zeng Guang’an says that the firm is fully embracing Industry 4.0 technology. Coupled with ongoing machine development, an expanding global sales and manufacturing network and long-established strong relationships with customers and suppliers, this is enabling the Chinese construction equipment giant to target RMB 50 billion (US$7.18bn) operating revenue by 2025. Chairman Zeng outlined the impressive scale of LiuGong’s future ambitions during an impassioned speech in front of an audi
  • Beijing's BICES reflects China's economic growth
    February 27, 2012
    The busy BICES show reflects China’s booming infrastructure investment and growing economy – Mike Woof reports. The recent BICES trade show in capital Beijing was extremely busy, with high visitor attendance levels and crowded aisles. The interest in the event strongly reflects the country’s massive infrastructure growth, which continues to develop. The construction equipment business has been identified as a key economic priority by the Chinese Government, with manufacturers being offered numerous incentiv
  • Elevated highway planned for Philippines
    February 23, 2017
    Proposals have been put forward for an innovative elevated highway stretch in the Philippines. The proposed route would run from the Delpan Bridge in the capital Manila, across the Pasig River and on to the Napindan Bridge in Taguig. The plans have been suggested by the construction firm AKH General Contractor. In addition to carrying two lanes for traffic in either direction, the 22km elevated highway would also provide a rapid transit system. Called the Integrated Viaduct and Personal Rapid Transit System
  • Emovis continues with Mersey Gateway tolling
    March 18, 2022
    Emovis provides collection of tolls and charges for both Mersey Gateway Crossing and the older 87m-long Silver Jubilee Bridge through its merseyflow brand name.