Skip to main content

China’s US$3.85bn Ya'an-Kangding highway to be completed in 2017

The construction of China’s US$3.85 billion (CNY 23.59 billion) Ya'an-Kangding highway will be completed and put into operation during 2017. Meanwhile, the environmental impact assessment (EIA) report for the 133.97km highway project is said to have been completed.
September 18, 2013 Read time: 1 min
The construction of China’s US$3.85 billion (CNY 23.59 billion) Ya'an-Kangding highway will be completed and put into operation during 2017. Meanwhile, the environmental impact assessment (EIA) report for the 133.97km highway project is said to have been completed.

Related Content

  • LiuGong aims to double US$700m export sales in 3 years
    April 15, 2013
    A senior LiuGong figure has revealed that the Chinese construction manufacturing giant is looking to double its US$700million overseas sales for 2012 in the next three years. Speaking at bauma 2013 Zeng Guang’an, the company’s vice chairman and president, explained how the ambitious international sales target was getting closer to being realised.
  • New airport road interchange in China being built
    January 5, 2016
    Construction work is now underway on the interchange for the second highway connecting to China’s Guangzhou Baiyun International Airport. The new highway is around 21.4km long and connects Huadu district with Tianhe district. The route features 15 bridges and has a design speed of 100km/h. The new link will improve connections between the airport and Guangzhou City and the work is costing US$1.32 billion. Located in South China, Guangzhou City lies comparatively close geographically to Hong Kong and develop
  • Minimum US $ 14.08bn investment in Philippines highways
    October 16, 2012
    A minimum of US $ 14.08 billion out of an overall Philippines public investment need of $ 16.79 billion has reportedly been earmarked by the Government for highways projects. Goals have been set by the Department of Public Works and Highways (DPWH) to enlarge 12,236m of current bridges, mend national bridges measuring 58,592m, to replace broken bridges covering 19,725m, and to lay new bridges with a combined length of 18,255m.
  • Blasting starts for Fiskefjord Tunnel
    October 17, 2023
    The 9.7km Fiskefjord Tunnel will be the longest tunnel within the public-private E10/rv 85 project in northern Norway.