Skip to main content

China’s US$3.85bn Ya'an-Kangding highway to be completed in 2017

The construction of China’s US$3.85 billion (CNY 23.59 billion) Ya'an-Kangding highway will be completed and put into operation during 2017. Meanwhile, the environmental impact assessment (EIA) report for the 133.97km highway project is said to have been completed.
September 18, 2013 Read time: 1 min
The construction of China’s US$3.85 billion (CNY 23.59 billion) Ya'an-Kangding highway will be completed and put into operation during 2017. Meanwhile, the environmental impact assessment (EIA) report for the 133.97km highway project is said to have been completed.

Related Content

  • Costa Rica: environmental possibly loom for Route 32 to Moin port
    October 18, 2016
    A construction start to the extension of Route 32 between Rio Frio and Limon is set for another setback after the government demanded more environmental work to be done. La Republica newspaper is reporting that Costa Rica’s Secretariat of Environment (Setena) Wants China Harbour Engineering Company (CHEC), to provide more information on the environmental impact of the proposed 107km project. Marco Arroyo, president of Setena, has told CHEC would it has until April 2017 to provide the information on v
  • Plans in hand for Colombian highway project
    December 5, 2013
    The Colombian authorities have plans in hand for a US$240 million highway upgrade project. In all, 10 groups have been pre-selected for the tender process for the work, according to a report by Business News Americas. The project is for upgrades and improvements to a 173km stretch of the Puerta de Hierro-Cruz del Viso highway. This work includes improvements to access roads in the area, which lies in Colombia’s northern Sucre, Bolívar and Atlántico departments. The country’s infrastructure agency, ANI, has
  • Bangkok in line for N1 Expressway tunnel
    September 15, 2023
    EXAT, the Expressway Authority of Thailand, said bidding could start in 2026 with construction starting in 2027 and opening in 2030.
  • Warm mix use in the US and Czech Republic is strong
    May 20, 2014
    The Czech Republic has seen its first ever use of warm mix produced using additive Evotherm - and a survey carried out in the US shows that warm mix is still on the rise there - Kristina Smith reports The troubled Blanka Tunnel in Prague will see the Czech Republic’s first ever use of Evotherm warm mix asphalt (WMA) technology. The 6km tunnel is the longest urban motorway tunnel in Europe and will take the north-west section of the city ring road below ground. Designed as dual carriageway throughout w