Skip to main content

China’s new undersea tunnel project moving ahead

Progress is being seen in China with the development of the country’s first undersea tunnel. The new tunnel will be located in Shenzhen and is expected to take three years to construct, once work commences at the end of 2018. The 8.05km connection will run between the Dachan Bay toll Gate on the Shenzhen-Guangzhou Riverside Expressway and Yueliangwan Boulevard in Qianhai. The tunnel stretch will be 1.1km long, with a 4.45km road connection at the Dachan Bay end and a 2.5km road link located in Qianhai.
July 17, 2018 Read time: 1 min
Progress is being seen in China with the development of the country’s first undersea tunnel. The new tunnel will be located in Shenzhen and is expected to take three years to construct, once work commences at the end of 2018. The 8.05km connection will run between the Dachan Bay toll Gate on the Shenzhen-Guangzhou Riverside Expressway and Yueliangwan Boulevard in Qianhai. The tunnel stretch will be 1.1km long, with a  4.45km road connection at the Dachan Bay end and a 2.5km road link located in Qianhai.

Related Content

  • Let’s Boogie in a new tunnel
    July 7, 2020
    The new Victory Boogie Woogie Tunnel will be the most sustainable tunnel in the Netherlands.
  • China’s massive new highway projects unveiled
    May 19, 2017
    Plans for massive highway construction projects have been unveiled in China. A 451km highway has been announced that will connect the cities of Yibin an Panzhihua. This is expected to cost as much as US$12 billion, with two firms carrying out the project under the build-operate-transfer model. Construction is due to commence later this year and is expected to take five years to complete. Meanwhile in Yunnan Province, the authorities are planning two highway projects worth a total of $3.75 billion. A new 50k
  • Chinese highway projects being planned
    January 3, 2019
    A number of major road and bridge projects are now commencing in China. In Sichuan Province an environmental impact assessment report is being carried out for the Jigzhi-Barkam highway project. Work is starting shortly on the highway, which will stretch 224km and is expected to cost US$4.3 billion to construct. The report is being carried out by the province’s Ecology and Environment Agency. This new highway will provide many challenges to construction due to the topography of the route and will feature 190
  • Cambodian connection construction contract
    October 31, 2018
    A major road project is being carried out in Cambodia to improve the transport link between the capital Phnom Penh and the port of Sihanoukville in Preah Sihanouk Province. Work on the 190km road project will cost in the region of US$1.9 billion and should take four years to complete. The road will be built as an expressway and will run alongside the existing National Road 4, which is also to benefit from $110 million of improvements. The new expressway is being constructed by the Chinese contractor China R