Skip to main content

China’s CMBE wins Padmar bridge, Bangladesh build contract

China Major Bridge Engineering Company (CMBE) has won the US$1.55 billion contract to build the main structure of Bangladesh's Padma bridge. A 100-year guarantee will be provided by CMBE for the 10km long 25m wide bridge as part of the contract secured from the Bangladeshi government. According to Bangladesh's Finance Minister Ama Muhith, a formal agreement will be signed with CMBE at some stage in June 2014. Around 6.15km of Padma bridge will be constructed over Padma river, with the remainder built on
May 28, 2014 Read time: 1 min
China Major Bridge Engineering Company (CMBE) has won the US$1.55 billion contract to build the main structure of Bangladesh's Padma bridge.

A 100-year guarantee will be provided by CMBE for the 10km long 25m wide bridge as part of the contract secured from the 1043 Bangladeshi Government.

According to Bangladesh's Finance Minister Ama Muhith, a formal agreement will be signed with CMBE at some stage in June 2014.

Around 6.15km of Padma bridge will be constructed over Padma river, with the remainder built on both banks.

For more information on companies in this article

Related Content

  • Mabey Hire supports the Whorlton Bridge
    June 10, 2025

    Whorlton Bridge in England’s County Durham has had to be closed to traffic while a major programme of works is carried out. Every component is to be removed, refurbished and replaced.

    To facilitate the works, a bespoke catenary system has been installed, with Mabey Hire’s adaptable and modular propping equipment used to construct the temporary structure.

  • Financing for Bangladesh road project secured
    October 14, 2021
    Financing has been secured for an important for Bangladesh road project.
  • New Turkish bridge opens to traffic
    June 30, 2016
    Turkey’s new Osman Gazi Bridge has now opened for traffic. This bridge can carry 40,000 vehicles/day, while halving the travel time needed using previous routes. This is a six lane suspension bridge measuring 3km and spanning the Sea of Marmara. Construction has taken 42 months and the structure has been designed to cope with the risk of earthquakes. The project has been co-ordinated by Japanese construction company IHI, with Siemens handling the role of electro and mechanical contractor. Siemens has dev
  • Building a replacement bridge in record time
    March 13, 2023
    The construction of a new bridge in Pittsburgh, Pennsylvania to replace a collapsed structure has been carried out in record time